Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T09FR01003
Case Details
Entered Date:
03/17/2009
Applicant:
SISTERS OF ST JOSEPH IN ARIZ
Description:
SIP
Outstanding Inspections
Case Number: T09FR01003
Case Status: FIELD
Case Description: INSPECTION
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2009 | INSP - SELF INSPECTION PROGRAM | JDAVIS | Correction Required | IFC 315.2.1: Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. |