Case: T08FR04659
Case Details
Entered Date:
12/08/2008
Applicant:
HAMILTON-EAST PIMA LLC
Description:
Self Inspection
Completed Inspections
Case Status: COMPLETE
Case Number: T08FR04659
Case Description: INSPECTION
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2008 | INSP - SELF INSPECTION PROGRAM | JDAVIS | Approved | Approved |
| 12/08/2008 | INSP - SELF INSPECTION PROGRAM | JDAVIS | Approved | IFC 315.2.1: Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. |