Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T08FR00074
Case Details
Entered Date:
01/07/2008
Applicant:
PARK MALL LLC
Description:
Fire Inspection
Completed Inspections
Case Status: COMPLETE
Case Number: T08FR00074
Case Description: INSPECTION
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2008 | INSP - LIFE SAFETY | BMERRITT | Approved | path cleared |
01/07/2008 | INSP - LIFE SAFETY | BMERRITT | Approved | 1003.6 Means of egress continuity. The path of egress travel along a means of egress shall not be interrupted by any building element other than a means of egress component as specified in this chapter. Obstructions shall not be placed in the required width of a means of egress except projections permitted by this chapter. The required capacity of a means of egress system shall not be diminished along the path of egress travel. ___ Maintain clear exit path. |