Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T07FR00940
Case Details
Entered Date:
05/11/2007
Applicant:
WILLIAMS ALLAN N
Description:
FULL FIRE INSPECTION CHECK LISTUSED
Outstanding Inspections
Case Number: T07FR00940
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2007 | INSP - FULL | SHIGGINB | Violation | BHH LIC GROUP HOME R-4 |
| 05/11/2007 | VIOL - FIRE PROTECTION SYSTEMS | SHIGGINB | Violation | 17. IFC 903.2.10 All new Group R Occ. except Groups R-3 An automatic sprinkler system shall be installed in the locations set forth in Sections 903.2.10.1 through 903.2.10.1.3. R4 w/ new C/O requires sprinklers. 1. RESIDENTAL SPRINKLER INSTALLED W/O PREMIT AND IMPROPERTLY. |
| 05/11/2007 | VIOL - FIRE PROTECTION SYSTEMS | SHIGGINB | Violation | Section 901.2.2 Plans for fire sprinkler systems. Complete plans and hydraulic calculations for fire sprinkler systems installations shall be submitted for review and approval prior to beginning installation, modification or alteration. Plans shall be drawn to an indicated scale, on sheets of uniform size and shall show, as a minimum the data required by NFPA13-1999 Chapter 8. Water supply data for hydraulic calculations shall be based on 90 percent of the available water supply as determined by flow test information. 1. NO WORK IS TO DONE ON SPRINKLER SYSTEM W/O PROPER PAPER WORK OR PRIMITS FORN THE CITY OF TUCSON. |
Completed Inspections
Case Status: COMPLETE
Case Number: T07FR00940
Case Description: INSPECTION
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2007 | VIOL - BUILDING SVCS & SYSTEMS | SHIGGINB | Approved | |
| 06/27/2007 | VIOL - BUILDING SVCS & SYSTEMS | SHIGGINB | Approved |