Case: T06FR02399
Case Details
Entered Date:
08/09/2006
Applicant:
CALIFORNIA PORTLAND CEMENT CO
Description:
UST removal
Completed Inspections
Case Status: FIELD
Case Number: T06FR02399
Case Description: INSPECTION
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2006 | INSP - AST/UST | JLANGEJA | Approved | UST removal- 1 x 10,000 gal diesel tank. This tank was purged with 200 lbs of CO2, O2 level @ 3% prior to breaking concrete. Tank was clean and soil samples were obtained by Dennis Krantz of Zelen Consultants & Contractors. He will send copy of results to TFD. Tank was removed from site for proper disposal. |