Case: T06DV02699
Case Details
Entered Date:
12/04/2006
Applicant:
HEIDEMANN GLENN A
Description:
FURNACE NOT WORKING//REPORTED SINCE OCTOBER//LANDLORD HAS NOT REPAIRED GLENN HEIDMANN NO PHONE #//CORRESPONDING THRU MAIL//ALSO HAS 3 JMV AND CONSTRUCTION MATERIALS AND DEBRIS IN HER YARD//ROOF LEAKS IN HALL WAY AND LIVING ROOM//HAYLEY IS PREGNANT DUE ANY DAY
Outstanding Inspections
Case Number: T06DV02699
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| NPO(HC)-HEATING & VENTILATION | None | Not Inspected | ||
| 12/21/2006 | INSP - INITIAL CODE ENFORCMENT | JVALDEZ | Violation | FURNACE INOPERABLE GAS LINE IS CAPPED OFF TO THE UNIT BASE BOARD HEATER INOPERABLE TENANT HAS TWO SPACE HEATERS. A SUPPLEMENT NOTICE TO FOLLOW/JV SCHEDULED MEETING WITH OWNER JAN 8 2007 1300 AT PROPERTY GO OVER ALL EXISTING VIOLATIONS |
Completed Inspections
Case Status: COMPLIAN
Case Number: T06DV02699
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2007 | INSP - FOLLOW UP CODE ENFORCE | JVALDEZ | Approved | PERMIT T07CM00179 FINAL BASE BOARD HEATER. NO SIGNS OF BEES, SOFIT WAS REPAIRED, VENT PIPES CONNECTED TO THE HOT WATER HEATERS. RED BMW WAS REMOVED. ALL VIOLATION HAVE BEEN ABATED. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T06DV02699
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 12/21/2006 | CONTACTED BY MAILING |