Case: T04DV00080
Case Details
Entered Date:
01/27/2004
Applicant:
EVENCHIK HARVEY B
Description:
COMPLAINT:MIN HOUSING-WATER PIPE IS LEAKING BEHIND UNIT B. UNIT G CALLED ON 03/10/04- DOOR JAMB BROKE (FRAME), INFESTED W/ROACHES. UNIT D-CEILING FALLING AROUND COOLER. FRONT AND EXIT DOOR HAVE IMPROPER WEATHERSTRIPPING CALLED 03/09/04
Outstanding Inspections
Case Number: T04DV00080
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2004 | INSP - INITIAL CODE ENFORCMENT | RCAMACHO | Correction Required | INITIAL INSPECTION MET WITH TENANT ON SITE, FOUND REAR YARD SATURATED WITH WATER. WATER LEAK AT WATER HEATER DRAIN VALVE. WATER LEAK AT HOSE BIB AT REAR YARD BY MECHANICAL ROOM. FRONT AND REAR EXTERIOR DOORS LACK REQUIRED SWEEP AND WEATHER STRIP. LIVE ROACHES FOUND IN KITCHEN AREA. TENANT STATES OWNER HAS NEVER EXTERMINATED UNIT. ROOF LEAK ABOVE COOLER VENT IN LIVING ROOM. NO SMOKE DETECTOR IN BEDROOM. TERMITE DAMAGE AT BASE OF SOUTH BEDROOM WALL. TERMITE DAMAGE TO BATHROOM DOOR JAMB AT BOTTOM. WATER LEAK AT FRONT OF PROPERTY BY STREET AT MAIN WATER LINE. MAIN LINE HAS BEEN REPAIRED IN 2 LOCATIONS FROM DAMAGE OF GARBAGE TRUCK IN THE PAST. WATER LINE REMAINS DUG UP AND NOT COVERED. AREA HAS BEEN FLAGGED OFF WITH CAUTION TAPE. MAIN LINE IS LEAKING. SEND NOTICE. PICTURES IN FOLDER. |
| 03/18/2004 | INSP - FOLLOW UP CODE ENFORCE | RCAMACHO | Correction Required | FOLLOW UP INSPECTION MET WITH TENANT ON SITE. SHE STATES MAINT PERSON HAS ATTEMPTED TO DO SOME SMALL REPAIRS. FOUND: NO SMOKE DETECTOR IN BEDROOM. WATER HEATER DRAIN VALVE STILL LEAKS. HOSE BIB AT REAR YARD AREA BY WATER HEATER STILL LEAKS.MAIN LINE LEAK AT FRONT PARKING AREA HAS BEEN REPAIRED BUT NOT COVERED. OPEN TRENCH EXISTS. TRENCH IS HAZARDOUS TO THE PUBLIC. BATHROOM DOOR JAMB IN SAME CONDITION. NO REPAIRS TO JAMB. TENANT STATES UNIT HAS NOT BEEN EXTERMINATED. TERMITE DAMAGE NOT REPAIRED. WEATHER STRIP HAS BEEN INSTALLLED BY MAINT. DOES NOT PASS INSPECTION. SELF ADHESIVE FOAM HAS ALREADY COME OF DOOR STOP. CONTACTED CHATEAU SUITES AND SPOKE TO CHASITY. SHE STATES MANAGEMENT CO. HAS TRIED TO COMPLETE VIOLATIONS ORDERED BUT THE TENANT REFUSES ENTRY. SEVERAL WORK ORDERS HAVE BEEN MADE BUT TENANT REFUSES ENTRY EACH TIME. INSPECTOR INFORMS MANAGEMENT CO. SHE MUST POST FRONT DOOR WITH 48 HOUR NOTICE FOR ENTRY TO COMPLETE REPAIRS TO INTERIOR OF UNIT. EXTERIOR REPAIRS WHICH DO NOT NEED ENTRY SHOULD BE COMPLETED IMMEDIATELY. ALSO NOTIFIED TENANT MANAGEMENT CO. STATES SHE IS NOT ALLOWING ENTRY. WHICH SHE DENIES. INFORMED TENANT MANAGEMENT CO. WOULD BE POSTING HER FRONT DOOR AND HAVE SCHEDULED REPAIRS FOR 10:30 AM MONDAY MORNING. SHE MUST ALLOW ENTRY AT THIS TIME. MAINT. PERSON SANTIAGO ALSO CONTACTED INSPECTOR. STATING HE HAS BEEN DENIED ENTRY SEVERAL TIMES. HE HAS BEEN NOTIFIED BY MAMAGEMENT CO. ENTRY HAS BEEN SET UP FOR MONDAY 10:30 AM. SANTIAGO HAS COPY OF NOTICE AND INSPECTOR ALSO WENT THROUGH NOTICE WITH MAINT. ON WHAT IS NEEDED TO COMPLY. SANTIAGO TO CONTACT INSPECTOR NEXT WEEK ON STATUS OF UNIT REPAIRS. (SEE PICTURES) |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T04DV00080
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
| Date | Name |
| 02/19/2004 | NOTICE OF VIOLATION ISSUED |
| 02/19/2004 | COURT ORDERED ABATEMENT |