Case: T03DV00803
Case Details
Entered Date:
08/26/2003
Applicant:
ARLAN INVESTMENT INC
Description:
COMPLAINT:MIN HOUSING-ROOF LEAKING IN BEDROOM
Outstanding Inspections
Case Number: T03DV00803
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T03DV00803
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2003 | INSP - INITIAL CODE ENFORCMENT | HLOPEZ | Approved | VISITED SITE, MET WITH TENANT & COMPLEX MANAGER, TENANT STATES ALL VIOLATIONS HAVE BEEN ABATED & HAD CALLED TO CANCELL INSP. MESSAGE WAS NOT FORWARDED TO INSPECTOR. ROOF REPAIRS WERE MADE ON 8/15/03, COMPLAINT MADE 8/26/03 STOVE & REFRIGERATOR HAVE BEEN REPAIRED & VERIFIED BY TENANT, MANAGER CONTACTED REGIONAL OFFICE & WILL HAVE COMPLETED INVIOCES FAXED TO D.N.R. TOILET HAD NEW FLUSH VALVE INSTALLED, SMOKE DETECTOR WAS CHECKED & FOUND TO BE WORKING. CONTRIBUTING FACTOR TO STOVE PROBLEM WAS EXCESSIVE AMOUNTS OF GREASE BUILD UP. OWNER & MANAGEMENT HAVE COMPLIED, CLOSE CASE. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T03DV00803
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 09/10/2003 | CONTACTED BY MAILING |