Case: T00VL00479
Case Details
Entered Date:
04/11/2000
Applicant:
ALEXANDER CHARLES & CATHY
Description:
COMPLAINT: UNIT BEING BUILT W/O PERMITS
Outstanding Inspections
Case Number: T00VL00479
Case Status: CLOSED
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2000 | INITIAL CODE VIOLATION | RVIDAL | Violation | STOP WORK ORDER |
| 04/14/2000 | FOLLOW UP CODE VIOLATION | RVIDAL | Correction Required | ADDTL COMMS - 4/14/00 RICHARD VIDAL MET WITH PLAN CHECKERS AND DAVE MANN AND WENT OVER FRAME WORK. OWNER SAID STRUCTUTRE WAS MADE FOR VINES. AND WILL HAVE NO SHEATHING ON TOP. PERMIT NOT REQUIRED PER DAVE MANN. VIOLATION INVALID CASE CLOSED. |
Completed Activity Special Conditions
Case Description - RES: BUILDING W/O PERMIT
Case Number - T00VL00479
Case Status: CLOSED
Total Completed Case Activity Conditions: 2
| Date | Name |
| 04/11/2000 | 4/10/00 STOP WORK ORDER ISSUED TO OWNER PER RICHARD VIDAL (RNTL ASMT): FOR UNIT BEING BUILT IN REAR OF HOUSE ATTACHED AND AT FRAMING STAGE DOES REQUIRE PLANS AND PERMITS BEFORE GOING FURTHER WITH WORK. ISSUING A STOP WORK ORDER. AND NOTICE OF VIOLATION WILL FOLLOW. A FOLLOW UP DATE WAS SCHEDULED DUE TO NO PAKCET WAS FOUND. SCHEDULED FOR 4/13/00. SENT PACKET TO TICKLER FILE. |
| 04/14/2000 | 4/14/00 RICHARD VIDAL MET WITH PLAN CHECKERS AND DAVE MANN AND WENT OVER FRAME WORK. WAS TOLD BY OWNER THAT IT WAS FOR VINES AND WILL HAVE NO SHEATHING ON TOP. WORK IS COMPLETE. PERMIT NOT REQUIRED PER DAVE MANN. DUE TO NO SHEATHING. MET WITH OWNER AT SITE AND TOLD HIM OF DECISION. VIOLATION INVALID CASE CLOSED. SENT PACKET TO RECORDS. |