Case Details

Status:

CLOSED

Type:

RES: BUILDING W/O PERMIT
Address:

Entered Date:

02/09/2000

Applicant:

CASTRO RAFAEL RODOLFO & VIRGINIA

Description:

COMPLAINT: PERMIT EXPIRED FOR RAMADA

Outstanding Inspections

Case Number: T00VL00157
Case Status: CLOSED
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
02/11/2000 INITIAL CODE VIOLATION FGREER Violation VIOLATION

Completed Inspections

Case Status: CLOSED
Case Number: T00VL00157
Case Description: RES: BUILDING W/O PERMIT
Total Completed Inspections - 1
End Date Description Inspector Results Comments
09/13/2000 FOLLOW UP CODE VIOLATION FGREER Approved 60 DAY F/U SCHEDULED FOR 11/13/00.

Completed Activity Special Conditions

Case Description - RES: BUILDING W/O PERMIT
Case Number - T00VL00157
Case Status: CLOSED
Total Completed Case Activity Conditions: 5
Date Name
03/14/2000 02/11/00 PER INSPECTOR F GREER, THERE IS AN EXPIRED PERMIT ON THE RAMADA IN BACK. FOLLOW UP SCHEDULED 03/15/00. 03/16/00 INSPECTOR F GREER GAVE TIME EXTENSION DUE TO SON TAKING OVER. 30-DAY FOLLOW UP SCHEDULED FOR 04/18/00. 04/25/00 PER INSPECTOR F GREER, PERMITS NEED TO BE RENEWED. 30-DAY FOLLOW UP SCHEDULED FOR 05/25/00.
06/01/2000 5/30/00 INSPECTOR F.GREER WAS IN CONTACT WITH VIRGINIA (OWNER)? SHE STATED THAT THEY WILL TAKE THE RAMADA DOWN. WILL GIVE 30 DAYS. FOLLOW UP SCHEDULED FOR 6/30/00. SENT PACKET TO TICKLER FILE.
09/07/2000 7/2/00 SITE VISIT/INSPECTION MADE. SEE INSPECTION RESULTS AND NOTATIONS FOR SPECIFIC INFORMATION.
09/20/2000 9/13/00 CONTACTED BY ???
08/08/2001 VIOLATION CLOSED.