Case: T00VL00084
Case Details
Entered Date:
01/26/2000
Applicant:
FUENTES HECTOR R SR & ZOILA AMER
Description:
COMPLAINT:CONSTRUCTING PATIO WITHOUT PERMITS
Outstanding Inspections
Case Number: T00VL00084
Case Status: COMPLIAN
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2000 | INITIAL CODE VIOLATION | FGREER | Violation | NOV ISSUED |
| 03/16/2000 | FOLLOW UP CODE VIOLATION | FGREER | Compliance | COMPLIANCE |
Completed Activity Special Conditions
Case Description - RES: BUILDING W/O PERMIT
Case Number - T00VL00084
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 01/26/2000 | 01/12/00 STOP WORK ORDER ISSUED AND POSTED PER INSPECTOR R CHAVEZ. BE ADVISED THIS IS A STOP WORK ORDER. DO NOT CONTINUE CONSTRUCTION ON THE BACK PORCH UNTIL PERMITS ARE OBTAINED. FOR INFORMATION ON HOW TO SECURE PERMITS GO TO 201 N STONE OR CALL 791-5550. ASK TO SPEAK TO A PERMIT SPECIALIST. THEY WILL ADVISE YOU ON HOW TO PROCEED. A NOTICE OF VIOLATION WILL FOLLOW, PICTURES TAKEN OF STOP WORK ORDER AND PORCH. |
| 01/26/2000 | 01/26/00 NOTICE OF VIOLATION ISSUED PER INSPECTOR R CHAVEZ FOR CONSTRUCTING AN ATTACHED PATIO @ THE BACK OF THE HOUSE APPROX 12X45 WOOD CONSTRUCTION. STOP WORK ISSUED ON 01/12/00 AND CONSTRUCTION CONTINUED IN LIEU OF NO PERMITS. SENT CERTIFIED MAIL Z551943341. 01/27/00 NOV SIGNED. FOLLOW UP SCHEDULED FOR 02/14/00. 02/29/00 PER INSPECTOR R CHAVEZ, STOP WORK ORDER THAT WAS POSTED WAS IGNORED AND WORK WAS COMPLETED. DOUBLE FEE IMPOSED PER INSPECTOR R CHAVEZ. FOLLOW UP SCHEDULED FOR 03/15/00. |
| 04/21/2000 | 3/6/00 VIOLATION ABATED PER F.GREER. PERMIT #T00BU00379 ISSUED ON 3/6/00. SENT PACKET TO RECORDS. |