Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

Closed - Resolved

Type:

RMIN / High Priority / Unit B-112 /Backed up sewage in unit coming up from tub flooding with raw sewage

Entered Date:

11/27/2023

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO1123-06625
Case Description: RMIN / High Priority / Unit B-112 /Backed up sewage in unit coming up from tub flooding with raw sewage
Total Completed Inspections - 2
End Date Description Inspector Results Comments
11/27/2023 COT - ENFC - Code Enforcement - Initial In Violation 137 PM - Contact on site with tenant. There is debris and water on floor consistent with a sewage backup in the bathroom. Tenant ran water at kitchen sink and is draining. Tenant states she has a hole in the bathroom ceiling above the shower. Did observe a hole in bathroom above shower. Called and spoke to owner, he states he had the drains unclogged yesterday at around 6 AM and wipes were found clogging the sewage system. Advised 30 days for repairs to the hole in ceiling. -VM
05/08/2024 COT - ENFC - Code Enforcement - Follow Up Passed 1247 PM - Contact with the resident on site, states repairs were made to the ceiling. Violation abated, close case. -VM