Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

Received

Type:

CFIR - Request for Building Safety for a Building Fire at Babylon Market

Entered Date:

10/20/2026

Applicant:

N/A

Description:

Completed Inspections

Case Status: Received
Case Number: CE-VIO1026-04371
Case Description: CFIR - Request for Building Safety for a Building Fire at Babylon Market
Total Completed Inspections - 1
End Date Description Inspector Results Comments
10/20/2026 COT - ENFC - Code Enforcement - Initial In Violation Arrived to scene at 959 PM and TFD was still on scene working the fire. Per TFD, the fire started in the southeast section of the structure near refrigeration units. Flames present caused damage to interior of the building and heavy smoke damage in the structure. There are multiple holes cut into the roof for firefighting and venting. Fire was in the attic space. Ceiling is removed throughout the structure. There is standing water in the structure. Did observe the use of extension cords in the property and the electrical panel at the rear of the building and the interior panel are both missing breakers or slots. Per TFD, TEP has cut power at the pole and the structure did not have active gas service. Structure is condemned and repairs shall be made by a licensed contractor with an issued permit. -VM