Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

Active

Type:

EMER - Per supervision emergency callout for an explosion and roof damage
Address:

Entered Date:

10/28/2025

Applicant:

N/A

Description:

Completed Inspections

Case Status: Active
Case Number: CE-VIO1025-04777
Case Description: EMER - Per supervision emergency callout for an explosion and roof damage
Total Completed Inspections - 1
End Date Description Inspector Results Comments
10/28/2025 COT - ENFC - Code Enforcement - Initial In Violation 427 pm - Called out to site by TFD for a gas leak and explosion in home. Arrived and found ceiling in kitchen above stove is separated and detached from wall. This damage extends on other side of wall in living room. In living room, at the central portion of home, a large, approximately 10 ft by 6 ft portion of ceiling drywall has collapsed. There are cracked and missing ceiling joists in this area. Ceiling joists are detached from wall. There is additional cracking at ceiling where it meets walls in the hallway abutting this, the bathroom, and in bedrooms, with the northwest bedroom having more extensive damage. On the north (front) exterior wall, bricks are blown out and have fallen down from above the front window. There is cracking to bricks above front door. Gas line enters attic space from outside at gas meter. Southwest Gas tested lines and determined no leaks up to the meter. They found a very small gas leak at a joint on the gas line on an interior closet in the hallway. Gas service was killed at the service line in the rear easement. TEP was called to scene and disconnected power at the meter. Home is condemned and has been red tagged. A structural engineer shall assess the entire ceiling and roof system of the entire structure, and the exterior walls to determine what needs repaired or demolished. Repairs shall be made within 60 days by a licensed contractor with an Issued Permit. -VM

Scheduled Inspections

SCase Number - CE-VIO1025-04777
Case Status: Active
Case Description:
Scheduled Date Description Inspector Status
12/30/2025 COT - ENFC - Code Enforcement - Follow Up Scheduled

Documents

File Name Document Type  
CE-VIO1025-04777 01 EAOV.PDF DOCUMENTS VIEW
CE-VIO1025-04777 02 NOV.PDF DOCUMENTS VIEW
CE-VIO1025-04777 03 NAO.PDF DOCUMENTS VIEW
IMAGES 2025-10-28 CE-VIO1025-04777.PDF DOCUMENTS VIEW
IMG_8290.JPG DOCUMENTS VIEW
IMG_8291.JPG DOCUMENTS VIEW
IMG_8292.JPG DOCUMENTS VIEW
IMG_8293.JPG DOCUMENTS VIEW
IMG_8294.JPG DOCUMENTS VIEW
IMG_8295.JPG DOCUMENTS VIEW
IMG_8296.JPG DOCUMENTS VIEW
IMG_8297.JPG DOCUMENTS VIEW
IMG_8298.JPG DOCUMENTS VIEW
IMG_8299.JPG DOCUMENTS VIEW
IMG_8300.JPG DOCUMENTS VIEW
IMG_8301.JPG DOCUMENTS VIEW
IMG_8302.JPG DOCUMENTS VIEW
IMG_8303.JPG DOCUMENTS VIEW
IMG_8304.JPG DOCUMENTS VIEW
IMG_8305.JPG DOCUMENTS VIEW
IMG_8306.JPG DOCUMENTS VIEW
IMG_8307.JPG DOCUMENTS VIEW
IMG_8308.JPG DOCUMENTS VIEW
IMG_8309.JPG DOCUMENTS VIEW
IMG_8310.JPG DOCUMENTS VIEW
IMG_8311.JPG DOCUMENTS VIEW
IMG_8312.JPG DOCUMENTS VIEW
IMG_8313.JPG DOCUMENTS VIEW
IMG_8314.JPG DOCUMENTS VIEW
IMG_8315.JPG DOCUMENTS VIEW
IMG_8316.JPG DOCUMENTS VIEW
IMG_8317.JPG DOCUMENTS VIEW
IMG_8318.JPG DOCUMENTS VIEW
IMG_8319.JPG DOCUMENTS VIEW
IMG_8320.JPG DOCUMENTS VIEW
IMG_8321.JPG DOCUMENTS VIEW
IMG_8322.JPG DOCUMENTS VIEW
IMG_8323.JPG DOCUMENTS VIEW
IMG_8324.JPG DOCUMENTS VIEW
IMG_8325.JPG DOCUMENTS VIEW
IMG_8326.JPG DOCUMENTS VIEW
IMG_8327.JPG DOCUMENTS VIEW
IMG_8328.JPG DOCUMENTS VIEW
IMG_8329.JPG DOCUMENTS VIEW
IMG_8330.JPG DOCUMENTS VIEW
IMG_8331.JPG DOCUMENTS VIEW
IMG_8332.JPG DOCUMENTS VIEW
IMG_8333.JPG DOCUMENTS VIEW
IMG_8334.JPG DOCUMENTS VIEW
IMG_8335.JPG DOCUMENTS VIEW