Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1025-04601
Case Details
Entered Date:
10/18/2025
Applicant:
N/A
Description:
Completed Inspections
Case Status: Received
Case Number: CE-VIO1025-04601
Case Description: TFD emergency-commercial fire
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2025 | COT - ENFC - Code Enforcement - Initial | In Violation | On site with TFD, TEP and Southwest Gas. Structural fire at a commercial building that sustained significant fire, smoke and water damage. There is extensive structural damage. The charred ceiling tiles/panels have collapsed and exposed structural beams/supports and insulation. There are fire inspection holes in the roof/ceiling along with fire, water and smoke damage. Electrical wiring/conduit are melted and exposed. Possible damage to HVAC system. There are multiple broken windows and doors. Including the rolling security shutters. TEP has terminated electrical service at the pole and will return to collect meter. Southwest Gas verified no gas service. TFD turned off water at the meter. City contractor has secured building. Permits required. A license contractor required for all repairs, replacements. |