Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO1024-04365
Case Details
Status:
Active
Type:
HIGH PRIORITY Building inspecton broke into power box tep is on seen Previous fire
Address:
Entered Date:
10/31/2024
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: CE-VIO1024-04365
Case Description: HIGH PRIORITY Building inspecton broke into power box tep is on seen Previous fire
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2024 | COT - ENFC - Code Enforcement - Initial | In Violation | The building power has been terminated by T.E.P. at the transformer due to a fire at the transformer. The property has been vandalized and stripped from electrical equipment and conductors. The building has a large section of the roof assembly removed. There is no permits or approvals on record for the removal of the roof assembly or replacement. There is couches, trash, and debris on the property. There is an inoperable green ford pickup truck on the property. Stop work order has been issued and posted on site. Building has been secured to prevent unauthorized entry. Contact has been made with the active property management. Pima County permit number P24AN0114 was obtained prior to removal of the roof assembly. Pending City permits for the complete demolition. |