Case: CE-VIO0926-03922
Case Details
Status:
Closed - Resolved
Type:
RMIN / UNIT 17204: There is an active, long-term structural roof leak that has caused interior ceiling damage, drywall failure, and crumbling plaster debris falling directly onto the bed living space. Mngr wrote leak not yet fixed, but executed an uncertified, cosmetic drywall patch/paint job to ceiling, wall & cavity.
Entered Date:
09/18/2026
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0926-03922
Case Description: RMIN / UNIT 17204: There is an active, long-term structural roof leak that has caused interior ceiling damage, drywall failure, and crumbling plaster debris falling directly onto the bed living space. Mngr wrote leak not yet fixed, but executed an uncertified, cosmetic drywall patch/paint job to ceiling, wall & cavity.
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2026 | COT - ENFC - Code Enforcement - Follow Up | Passed | All violations abated at this time. Close Case. | |
| 09/22/2026 | COT - ENFC - Code Enforcement - Initial | Completed | On site at property there is evidence of roof leak that occurred all interior issues have been abated management has roof contractor coming to inspect and repair exterior roof issues as needed. Will follow up in 10 days. |