Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO0925-04125
Case Details
Status:
Active
Type:
CFIR - TFD Callout for a high rise apartment fire and subsequent flooding of the building Event No. F252650026
Address:
Entered Date:
09/22/2025
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: CE-VIO0925-04125
Case Description: CFIR - TFD Callout for a high rise apartment fire and subsequent flooding of the building Event No. F252650026
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | COT - ENFC - Code Enforcement - Initial | In Violation | 335 am - Called out to site by TFD. Fire started in Unit 206 in kitchen. Appears to have been large amounts of food and debris on stove. Fire burned cabinets, a light switch and drywall in the area. Fire sprinkler above stove activated and extinguished fire. At the time of arrival, the hallway in front of 206 and the hallway west of unit near trash chute have standing water. Water is draining down to the first floor. Directly below 206 is a hallway that runs east west with a storage room, and the trash chute room to the west, and a hallway to the west of this. There is a laundry room and bathrooms in this area. All of these areas have water draining through the ceiling, light fixtures, and vents. There is approximately 1 inch of water on the ground. To the north of this area is a gym with two offices. The offices had standing water. |