Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO0924-03880
Case Details
Status:
Stop Work Order
Type:
RVAC / Unit 27 / Dilapidated trailer outside trash, high weeds and broke doors, appliances outside and inside of property has been gutted
Address:
Entered Date:
09/25/2024
Applicant:
N/A
Description:
Completed Inspections
Case Status: Stop Work Order
Case Number: CE-VIO0924-03880
Case Description: RVAC / Unit 27 / Dilapidated trailer outside trash, high weeds and broke doors, appliances outside and inside of property has been gutted
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2024 | COT - ENFC - Code Enforcement - Initial | Completed | Unit marked 27 has no active power, T.E.P. has been notified to require a clearance from the City of Tucson prior to energizing the pedestal. The Pedestal lacks proper workspace clearance from the abutting mobile home. The lid to the pedestal is obstructed from being opened completely. The downstream receptacle that the mobile home connects to is damaged. The cord that connects to the exterior of the mobile home is completely severed. The mobile home has damaged exterior windows and door. The interior of the mobile home has been completely gutted. There is exterior nonmetallic cable with the date stamp 2004 that is installed in a non-code complaint manner. Stop work order has been posted at the mobile home unit with the notice of violation requiring a permit. |