Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

Closed - Resolved

Type:

RWOP : A path was created in front of the property to direct the flow of water, neighbors are concerned that this is a tripping hazard.

Entered Date:

08/13/2025

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO0825-03430
Case Description: RWOP : A path was created in front of the property to direct the flow of water, neighbors are concerned that this is a tripping hazard.
Total Completed Inspections - 2
End Date Description Inspector Results Comments
08/18/2025 COT - ENFC - Code Enforcement - Initial Completed On site at property - Verified a rock-lined ditch was dug out along the street for water catchment. The ditch is perpendicular with the street and could be a hazard to pedestrians and motorists. Compliance review and permits are required. Issuing notice of violation.
10/21/2025 COT - ENFC - Code Enforcement - Follow Up Completed On site at property - all areas have been filled in and are no longer a hazard or violation. Owner is not pursuing permits for any further work at this time. VIOLATIONS ABATED. CLOSE CASE.

Documents

File Name Document Type  
10500 PLACITA LOMA VERDE (1).JPG DOCUMENTS VIEW
10500 PLACITA LOMA VERDE (2).JPG DOCUMENTS VIEW
10500 PLACITA LOMA VERDE (3).JPG DOCUMENTS VIEW
10500 PLACITA LOMA VERDE (4).JPG DOCUMENTS VIEW