Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

Active

Type:

RMIN / Assisted Living Home / Multiple AC units are broken in the main building, Unverified temperature inside is possibly above 90 degrees. Part of the ceiling collapsed due to leak and is located by the kitchen in the Tynon unit

Entered Date:

07/15/2026

Applicant:

N/A

Description:

Completed Inspections

Case Status: Active
Case Number: CE-VIO0726-02989
Case Description: RMIN / Assisted Living Home / Multiple AC units are broken in the main building, Unverified temperature inside is possibly above 90 degrees. Part of the ceiling collapsed due to leak and is located by the kitchen in the Tynon unit
Total Completed Inspections - 2
End Date Description Inspector Results Comments
07/16/2026 COT - ENFC - Code Enforcement - Initial In Violation ONSITE AT PROPERTY, VERIFIED MULTIPLE ROOMS WITH PORTABLE A/C UNITS DUE TO INOPERABLE A/C. MULTIPLE CEILING WATER LEAKS THROUGHOUT THE FACILITY. UPDATE: 7\23\26 stopped in and spoke to administrator, he is going to send me invoices and proof of work being completed on ACs and roof
09/08/2026 COT - ENFC - Code Enforcement - Follow Up In Violation MANAGEMENT EMAILED WITH IVOICES AND PROPOSALS FOR ROOF AND A/C WORK. WILL KEEP ME POSTED AS TO WHEN WORK WILL BE COMPLETED

Scheduled Inspections

SCase Number - CE-VIO0726-02989
Case Status: Active
Case Description:
Scheduled Date Description Inspector Status
10/09/2026 COT - ENFC - Code Enforcement - Follow Up Scheduled