Case: CE-VIO0726-02965
Case Details
Status:
Closed - Unfounded
Type:
RMIN/ no cooling in multiple units (495, 498, 6) up to 90 degrees
Address:
Entered Date:
07/15/2026
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Unfounded
Case Number: CE-VIO0726-02965
Case Description: RMIN/ no cooling in multiple units (495, 498, 6) up to 90 degrees
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | COT - ENFC - Code Enforcement - Initial | Passed | Performed several temperature test throughout this complex. I sampled 4 units, two that were o the complaint and two random units. None of the units temperature readings were above or even close. The highest temperature was approximately 77 degrees. Management stated that they had to repair the chiller system which took one 24 hour day. |