Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: CE-VIO0724-02925
Case Details
Status:
Closed - Resolved
Type:
Unit 15L No Ac, damaged drywall and flooring
Address:
Entered Date:
07/26/2024
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0724-02925
Case Description: Unit 15L No Ac, damaged drywall and flooring
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/25/2024 | COT - ENFC - Code Enforcement - Initial | In Violation | Management has provided a temporary cooling device while drywall behind the HVAC system is being repaired. The drywall in the hallway bathroom has been repaired pending to be taped, textured, and painted. Once the drywall process is completed, the vanity will be re-installed along with the toilet. Will monitor progress. | |
03/06/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | HVAC unit placed back in, drywall repaired in HVAC closet and hall bathroom. Closing case. |