Case Details

Status:

Closed - Resolved

Type:

ZRES/CWOP: Smell Complaint: MMJ Facility may lack C of O or final approval for facility (see PDSD); Odor Mitigation Plan is a required part of the MMJ approval. Facility is off-gassing at different times. (W3)

Entered Date:

05/24/2023

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO0523-03732
Case Description: ZRES/CWOP: Smell Complaint: MMJ Facility may lack C of O or final approval for facility (see PDSD); Odor Mitigation Plan is a required part of the MMJ approval. Facility is off-gassing at different times. (W3)
Total Completed Inspections - 2
End Date Description Inspector Results Comments
05/26/2023 COT - ENFC - Code Enforcement - Follow Up Passed I REVISITED SITE, MET WITH THE OWNER, LAWYER, TWO MANAGERS AND PERSON RESPONSIBLE FOR OPERATING THE ODOR MITIGATION SYSTEM. THERE WAS A SEPERATE BUILDING FOR THE SYSTEM, 6 GROW HOUSES ON THE SOUTH SIDE AND 6 ON THE NORTHSIDE THAT THE SYSTEM FEED. THEY TOOK ME TO THE PUMP AREA, PUMP WAS SMALLER THAN I EXPECTED BUT A LARGE PLUMBING WALL ON THE NORTH WALL OF THIS ROOM, THEY EXPLAINED THAT THE PUMP FEEDS ALL 12 GROW HOUSES. WE THEN WALKED TO WHERE WE FOUND A LARGE CONTAINER WITH THE SOLUTION THAT BREAKS DOWN THE ODOR, THERE WAS A WATER WALL THAT PROVIDES MOISTURE IN THE AIR AND ALLOWS SOLUTION TO WORK AND THEN AT THE END OF EACH BUILDING A LARGE FAN THAT REMOVES THE MOISTURE FROM EACH GROW HOUSE. I DID OBSERVE THE SYSTEM AND HAVE NO FURTHER ISSUES AS THE C/O WAS OBTAINED AND ODOR MITIGATION SYSTEM A PART OF THE CASE PROJECT, INSPECTED AND FINALED. COMPLIANCE CLOSE CASE.
05/25/2023 COT - ENFC - Code Enforcement - Initial Passed VISITED SITE, MET WITH TWO OF THE SITE MANAGERS, I EXPLAINED WHY I WAS THERE AND ALLOWED BOTH MANAGERS TO READ THE COMPLAINT FORM, THEY STATED THAT THEY THOUGHT THAT THEY HAVE THEIR C/O AND STATED THE ODOR MITIGATION SYSTEM IS IN PLACE BUT THAT IT WOULD BE BEST TO SPEAK WITH THE OWNER SO THAT BOTH ISSUES CAN BE VERIFIED AND THEY ASKED IF THEY COULD HAVE THE OWNER CONTACT ME LATER TODAY. THEY WERE GIVEN MY BUSINESS CARD AND STATED OWNER WOULD BE IN LATER TODAY AND WOULD CONTACT ME LATER. I LATER RECEIVED A CALL FROM THE OWNER, WE DISCUSSED THE COMPLAINT AND I ASKED IF HE COULD OBTAIN THE C/O AND ANY RECORDS OF THE ODOR MITIGATION SYSTEM AND HE STATED HE WOULD. AFTER OUR INITIAL CONTACT HE THEN EMAILED LISA BOWERS (PDSD) FOR THE INFORMATION. I LATER RECEIVED A EMAIL FROM LISA BOWERS SENDING A COPY OF THE C/O UNDER PERMIT #T20CMO3686AND ISSUED ON 12/16/2021. LISA ALSO STATED THAT THE ODOR MITIGATION SYSTEM WAS APPROVED AND INSPECTED AS PART OF THIS PROJECT AND STATED ZONING REVIEWERS LOOK AT THE DESIGN AND ENSURE THAT SPECS OF THE PROPOSED DESIGN MEET CODE. DAN QUINN INSPECTED AND APPROVED THE ODOR MITIGATION SYSTEM. C/ E SUPERVISOR ASKED THAT I MEET WITH THE OWNER OF THE COMPANY AND ASSURE THAT THE ODOR MITIGATION SYSTEM IS IN PLACE AND WORKING. A MEETING WAS SET UP WITH THE OWNER FOR FRIDAY 5/26.