Case Details

Status:

Active

Type:

Stop work order issued, Commercial Tenant improvement without permits
Address:

Entered Date:

02/23/2026

Applicant:

N/A

Description:

Completed Inspections

Case Status: Active
Case Number: CE-VIO0226-00890
Case Description: Stop work order issued, Commercial Tenant improvement without permits
Total Completed Inspections - 2
End Date Description Inspector Results Comments
02/23/2026 COT - ENFC - Code Enforcement - Initial In Violation Construction work being conducted on second floor of commercial building. Replacing walls, flooring, ventilation, drywall, insulation, electrical and mechanical work. Issued a stop work order to the store manager on site. Posted work area.
06/16/2026 COT - ENFC - Code Enforcement - Follow Up In Violation Nothing has been done to repairing restoration of the area being worked on since stop work order on February. Met with Store Manager regarding the stop work, permits required. Explained to Store Manager the must start the permit process within the month. Asked to see the upstairs area. An area I did not see. Manager showed me the area. A lot of work was conducted. Walls removed, ceiling removed, insulation, lighting, electrical,2 air handlers, venting system all affected by the demo process. Please see the pictures uploaded into the system.