Case: CE-VIO0224-00550
Case Details
Status:
Closed - Resolved
Type:
MULT : House is vacant and abandoned; excavation in the backyard, house completely open in the back, holes in the roof, a hole on the backyard covered by an interior door
Address:
Entered Date:
02/08/2024
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0224-00550
Case Description: MULT : House is vacant and abandoned; excavation in the backyard, house completely open in the back, holes in the roof, a hole on the backyard covered by an interior door
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2024 | COT - ENFC - Code Enforcement - Follow Up | Completed | Permit T21OT00575 Still a valid permit. Contractor was working on the site. The property next door sold. The Contractor had to go back to the city to get approval from the new neighbor for the work being conducted. All work stopped. Contractor is waiting on the neighbors approval before he can continue working on the project. Property is completely fenced off and padlock shut. Close case |
Scheduled Inspections
SCase Number - CE-VIO0224-00550
Case Status: Closed - Resolved
Case Description:
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
03/12/2024 | COT - ENFC - Code Enforcement - Initial | Scheduled |