Case Details

Status:

Closed - Resolved

Type:

HPZ: unapproved structure modifications (incl. balcony) without HPZ approval: application made, but work continues at location (stop work order req)
Address:

Entered Date:

02/23/2023

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO0223-02078
Case Description: HPZ: unapproved structure modifications (incl. balcony) without HPZ approval: application made, but work continues at location (stop work order req)
Total Completed Inspections - 2
End Date Description Inspector Results Comments
02/23/2023 COT - ENFC - Code Enforcement - Initial Passed Construction work being conducted on the property.
08/07/2023 COT - ENFC - Code Enforcement - Follow Up Passed Met w/owner about court, sidewalk repair and also noticed up on the roof the HVAC unit? Appears to have burn marks around the electrical wiring. Showed the owner and let him know I was concerned about seeing that issue. Will ask for a continuance in court to allow owner to work with the Historial Dept and Bldg Dept.