Case Details

Status:

Closed - Resolved

Type:

RMIN / UNIT 120: Sink disposal is not working properly and toilet is cracked

Entered Date:

01/23/2026

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO0126-00346
Case Description: RMIN / UNIT 120: Sink disposal is not working properly and toilet is cracked
Total Completed Inspections - 2
End Date Description Inspector Results Comments
01/27/2026 COT - ENFC - Code Enforcement - Initial Completed On site , spoke to tenant and manager. The kitchen sink the side with the garbage disposal will not drain properly. The disposal is not working. The master bathroom toilet is cracked and linking. The sink in the master bathroom is leaking. The bottom of the vanity in the master bedroom needs repair from the water leak.
02/10/2026 COT - ENFC - Code Enforcement - Follow Up Passed On site with manager. Called the tenant no answer and cannot leave a message. Manager stated the tenants moved out and the violations were abated. Close case.