Case: 150017
Case Details
Entered Date:
07/17/1998
Applicant:
SOPER JOHN R & MARTHA T JT/RS
Description:
COMPLAINT:FIRE EMERGENCY CALLOUT
Outstanding Inspections
Case Number: 150017
Case Status: COMPLIAN
Case Description: RES: FIRE
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/1998 | FOLLOW UP CODE VIOLATION | WWRIGHT | Violation | VIOLATION |
| 12/16/1997 | INITIAL CODE VIOLATION | TSTEVENS | Violation | VIOLATION |
Completed Activity Special Conditions
Case Description - RES: FIRE
Case Number - 150017
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
| Date | Name |
| 07/17/1998 | 12/16/98 CONTACTED IN PERSON AND OWNER SIGNED N&O INDEMN. LETTER FOR FIRE EMERGENCY CALLOUT. INSP. T. STEVENS HAD W.M.J. SECURE BUILDING - F.U. 10/14/98 10/19/99 BLDG SECURE FROM ENTRY FOLLOW UP SCHUELED FOR 60 DAYS AS OF 06/14/99 SCHUELED FOLLOW UP FOR 10/20/99 PUT ORIGINAL PACKET INTO TICKLER DATED 10/20/99. AL |
| 10/22/1999 | 12/15/96 SITE VISIT/INSPECTION MADE DUE TO AN EMERGENCY FIRE CALLOUT. NO OTHER INFORMATION WAS EVER ENTERED. SEE INSPECTION RESULTS AND NOTATIONS FOR SPECIFIC INFORMATION. 10/21/99 PER INSPECTOR RAUL CHAVEZ, THE BUILDING IS SECURE. FOLLOW UP SCHEDULED FOR 01/21/2000. 01/21/00 BUILDING SECURE PER INSPECTOR F GREER. FOLLOW UP SCHEDULED FOR 04/21/00. 04/24/00 BUILDING SECURE PER INSPECTOR F GREER. 90-DAY FOLLOW UP SCHEDULED FOR 07/24/00. |