Special Development Requests & Requirements

Address: 999 E BROADWAY BL
Date - 09/06/2026 6:19 p.m.
Total Number Of Special Development Permits - (5)
Activity Number Status Apply Date Expired Date Unit Type Description
H000009131 CLOSED 06/30/2017 N/A Historical Information
T17SA00125 COMPLETE 03/28/2017 N/A Zoning Adminstration Letter
T17SA00280 COMPLETE 07/07/2017 N/A Zoning Adminstration Letter
T18SA00399 FINAL 09/13/2018 N/A Zoning Adminstration Letter TEMPORARY NOISE EXEMPTION
T19SA00446 COMPLETE 11/04/2019 N/A Zoning Adminstration Letter ZONING LETTER

Permits

Address: 999 E BROADWAY BL
Date - 09/06/2026 6:19 p.m.
Total Number Of Permits - (9)
Permit Status Apply Date Expired Date Unit Type Description
T18FC00447 Expired 05/30/2018 08/02/2019 Fire Construction Permit Fire Alarm & Detection Systems - INSTALLATION OF A NEW FIRE ALARM SYSTEM; Fire Alarm Systems - New Sq Ft: 294828; Fire Alarm Systems - # New Stories: 8; Additional Plan Reviews: 2
DS17-08 Approved 05/17/2017 N/A Zoning Verification Letter THE MARK AT TUCSON - TSM Section 8-01.9.0
DP17-0079 Complete 04/04/2017 01/29/2020 Development Package SITE/GRADING/SWPPP - The Mark, multi-family dwelling
T17RW04220 FINAL 09/25/2017 09/16/2019 ROW SIDEWALK CLOSURE FOR TEMPORARY CONSTRUCTION TRAILER PLACEMENT 03/02/2018-LANE CLOSURE FOR CONCRETE POUR 8PM-6AM 03/13/2018-PLAN CHANGE- 24 HOUR 03/22/2018-CHANGE TO INCLUDE OVERNIGHT CONCRETE POUR MARCH 22-23 AND APRIL 2-3, 2018 PER TNE. MARCH 22 AND 23- BEGIN AT 2AM AND END AT 6AM APRIL 2 AND 3 -BEGIN AT 1AM AND ENDING AT 6AM 06/27/2018-PLAN CHANGE-24 HOUR CLOSURE 07/23/18 - PLAN CHANGE TO INCLUDE FULL CLOSURE DURING CLEAN-UP OF ON-SITE FIRE THROUGH 08/3/18 AND OVERNIGHT CONCRETE POURS 7/17/18, 07/27/18 & 07/31/18 PER TNE. 07/252018-PLAN CHANGE- PLAN CHANGE TO INCLUDE CONNECTIONS TO STORM DRAINS IN THE ROW AT SOUTHEAST AND SOUTHWEST CORNERS OF THE PROJECT. 8/1/18 TNE FOR JULY 31 CHANGED TO AUGUST 4
T17TUP0009 CLOSED 09/11/2017 N/A TUP Construction Trailer to be located in south adjacen ROW. Real Estate approved and will provide ROE
T18BU00300 FINAL 05/14/2018 01/19/2020 POOL/SPA POOL
T18RW00253 FINAL 01/12/2018 03/16/2018 ROW 90 LF FOR SEWER WORK
T18RW00435 FINAL 01/25/2018 02/28/2018 ROW COMPLETING A 4" METER, A 6" FIRE SERVICE AND A POSSIBLE 6" FIRE HYDRANT INSTALL. WITH 60 FEET OF WORK IN THE ASPHALT AND 10 FEET OF WORK IN THE DIRT.
T19OT00164 FINAL 02/20/2019 11/27/2019 SIGN 2-ILLUM WALL SIGNS

Plans

Address: 999 E BROADWAY BL
Date - 09/06/2026 6:19 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-17-0079 Active 04/04/2017 01/29/2020 -- Commercial Water Harvesting Ordinance SITE/GRADING/SWPPP - The Mark, multi-family dwelling
T17PRE0003 CLOSED 01/13/2017 N/A NEIGHBORHOOD NOTIFICATION -- LABELS