Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 945 W CONGRESS ST
Search
Parcel Attributes
| Parcel | 116182270 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 1 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
| Tucson Registered Neighborhood | Menlo Park |
| Major Street & Route | Arterial or Collector |
| National Register Historic District | Menlo Park Historic District |
| Structure on National Register of Historic Places | Contributing |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 945 W CONGRESS ST
Date - 12/13/2025 10:55 p.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Menlo Park District | 949 |
Permits
Address: 945 W CONGRESS ST
Date - 12/13/2025 10:55 p.m.
Total Number Of Permits - (4)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T03EL02317 | FINAL | 11/26/2003 | 05/26/2004 | ELECT | REPLACE:ELECTRIC PANEL | |
| T20RW04948 | FINAL | 09/08/2020 | 10/08/2020 | ROW | JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REPLACE DAMAGED TRAFFIC SIGNAL LOCATED ON GRANDE AV / CONGRESS ST. EMERGENCY - AFTER THE FACT PERMIT - WORK COMPLETED ON 09/08/2020 | |
| T21RW04526 | FINAL | 10/05/2021 | 10/13/2021 | ROW | CLOSURE OF SB GRANDE AV AND EB CONGRESS ST FOR THE HBO MAX FILMING. LAW ENFORCEMENT WILL MANAGE AND MAINTAIN TRAFFIC FLOW WITH PERIODIC FULL HOLDS OF TRAFFIC. QUAIL CONSTRUCTION TO STAY ON PRODUCTION SITE FOR TRAFFIC MANAGEMENT. COT PERSONNEL TO DEACTIVATE THE PEDESTRIAN CROSSWALK SOUND AND LIGHTS (DARKEN HEADS). RE-ACTIVATION TO OCCUR AT THE CONCLUSION OF FILMING. NOTE: WITH THE HIGH VOLUME OF TRAFFIC DURING PEAK TRAFFIC HOURS AT THIS INTERSECTION, IT IS RECOMMENDED THAT MESSAGE BOARDS NOTIFYING THE TRAVELING PUBLIC OF THE UPCOMING RESTRICTIONS BE PLACED 3 BUSINESS DAYS PRIOR TO RESTRICTIONS. | |
| T22RW02522 | FINAL | 07/14/2022 | 08/26/2022 | ROW | JOC FOR STRIPING - 181942-02 REMOVE ALL REFLECTIVE PAVEMENT MARKINGS (RPM's) WITH NEW, 200 FEET IN ALL DIRECTIONS FROM THE INTERSECTION OF W CONGRESS ST AND N GRANDE AV. REPAINT THE WG4 IN THE BIKE LANE ALONG W CONGRESS ST, ALONG WITH GREEN BIKE BARS AS INDICATED ON PLANS, ON EITHER SIDE OF THE INTERSECTION WITH S GRANDE AV. WORK TO BE COMPLETED IN ONE LANE AT A TIME TO MINIMIZE IMPACT TO TRAFFIC, WITH EACH LANE OPERATION TO LAST A MINIMAL AMOUNT OF TIME. COORDINATE PAVEMENT MARKING WITH DTM TE TECH DIANE LLOYED 520-373-0044 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |