Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Annexations & Original City Zoning (OCZ)

Address: 9230 E SPEEDWAY BL
Date - 01/11/2025 9:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-74-68 Hidden Hills East No. 3 - Harrison Estates 4256 4336

Rezoning Cases

Date - 01/11/2025 9:43 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-81-35 Platt - Speedway Boulevard R-2 Effectuated 10/13/2010

Special Development Requests & Requirements

Address: 9230 E SPEEDWAY BL
Date - 01/11/2025 9:43 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Unit Type Description
H000013189 CLOSED 12/29/2021 N/A Historical Information
T18SA00045 COMPLETE 01/18/2018 N/A Zoning Adminstration Letter

Permits

Address: 9230 E SPEEDWAY BL
Date - 01/11/2025 9:43 a.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
T22SA00143 In Review 03/17/2022 N/A Zoning Compliance
T15EX02663 FINAL 09/03/2015 11/03/2015 EXCAV POTHOLING A PRIVATE SEWER LINE THAT CROSSES SPEEDWAY BLVD Potholes within the travel and bicycle lanes will have to be repaired per Maricopa Association of Governments (MAG) Standard Detail 212, Type B. All others within the pavement areas shall be repaired per MAG SD 212, Type A. WORK ORDER # 567455
T15EX03101 FINAL 10/21/2015 12/21/2015 EXCAV Excavate 28 LF and repair a private sewer line the crosses under Speedway Blvd. the Patch will be repair per COT/PC SD 216, then Speedway will have a 2" mill and inlay of ARAC 25 LF on either side of the trench.
T15TC02056 FINAL 09/03/2015 N/A BARRICAD POTHOLING A PRIVATE SEWER LINE THAT CROSSES SPEEDWAY BLVD. WORK ORDER # 567455
T15TC02438 EXPIRED 10/21/2015 N/A BARRICAD Excavate 28 LF and repair a private sewer line the crosses under Speedway Blvd. the Patch will be repair per COT/PC SD 216, then Speedway will have a 2" mill and inlay of ARAC 25 LF on either side of the trench.
T16EX00015 FINAL 01/04/2016 03/06/2016 EXCAV POTHOLING A PRIVATE SEWER LINE THAT CROSSES SPEEDWAY BLVD. PIPE WAS NOT REPAIRED WITHIN PREVIOUS PERMITS. **** DUE TO PAVEMENT MORATORIUM WILL NEED TO MILL & PAVE PER ATTACHED PLAN *** NIGHT WORK ONLY *** NOTE: 1/7/16, WORK DESCRIPTION CHANGE TO READ: REPLACING MEDIAN CURBS AND PAVERS. MILLING AND PAVING 50' X LEFT LANE ON EASTBOUND PER COT STANDARD DETAILS. SEWER REPAIR WILL BE DONE MONDAY NIGHT (11/11/16) 6 PM TO 6 AM. MEDIAN REPLACEMENT, MILL, AND FILL WILL BE DONE TUESDAY AND WEDNESDAY (11/12/16 - 11/13/16) DURING THE DAY.
T16TC00025 FINAL 01/04/2016 N/A BARRICAD POTHOLING A PRIVATE SEWER LINE THAT CROSSES SPEEDWAY BLVD. PIPE WAS NOT REPAIRED WITHIN PREVIOUS PERMITS.