Address Search: 9100 E BROADWAY BL
Search
Parcel Attributes
| Parcel | 13401016C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | SR |
| Tucson Ward | Ward 2 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 9100 E BROADWAY BL
Date - 11/17/2026 5:17 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/17/2026 5:17 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-07-25 | McCown-Broadway Blvd | SH | Expired | 09/28/2007 |
Permits
Address: 9100 E BROADWAY BL
Date - 11/17/2026 5:17 p.m.
Total Number Of Permits - (6)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-1122-00767 | Issued | 11/14/2022 | 06/10/2023 | Residential Building - One or Two Family | Storage Container | |
| TC-RES-0223-02547 | Expired | 02/02/2023 | 08/01/2023 | Residential Building - One or Two Family | Enclosed carport, detached from the house, in front yard. Will not be running electrical or water to carport. | |
| T19CM08328 | FINAL | 11/12/2019 | 01/09/2022 | COMBO | SFR | |
| T21BU00541 | ISSUED | 12/08/2021 | 06/06/2022 | WALL/FEN | Block wall to enclose the parcel. I would estimate the value at 30,000 | |
| T21RW02357 | FINAL | 05/13/2021 | 07/18/2021 | ROW | TEP TO SET UNDERGROUND XFMR AND INSTALLING RISER ON POLE WO 6326404. NOTE: Proof of notification is required at the time of the preconstruction meeting. | |
| T21RW02932 | FINAL | 06/17/2021 | 09/28/2021 | ROW | CURB CUT FOR RESIDENTIAL DRIVEWAY. CURB CUT SHALL NOT INTERFERE WITH TRAFFIC. CUSTOM SAW CUT TO COMPLETE CURB SAW CUT. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |