Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Historic Records Requests

Address: 902 E SPEEDWAY BL
Date - 11/15/2024 1:49 a.m.
Total Number Of Historic Records Requests - (3)
Name Action
Address: 902 E SPEEDWAY BL - Doc Type: CERT OF OCC VIEW
Address: 902 E SPEEDWAY BL - Doc Type: CERT OF OCC VIEW
Address: 902 E SPEEDWAY BL - Doc Type: CERT OF OCC VIEW

Special Development Requests & Requirements

Address: 902 E SPEEDWAY BL
Date - 11/15/2024 1:49 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Unit Type Description
T19SA00046 COMPLETE 02/04/2019 N/A Zoning Adminstration Letter ZONING LETTER REQUEST/REPLY
T19SA00373 COMPLETE 09/03/2019 N/A Zoning Adminstration Letter ZONING LETTER

Permits

Address: 902 E SPEEDWAY BL
Date - 11/15/2024 1:49 a.m.
Total Number Of Permits - (13)
Permit Status Apply Date Expired Date Unit Type Description
DP19-0056 Complete 03/05/2019 04/26/2022 Development Package SITE/GRADING/SWPPP/MGD - Hub On Campus Park Avenue, group dwelling, food service, and retail.2nd
T00ME00605 FINAL 06/13/2000 12/10/2000 MECH PRESUURE VESSEL CERTIFICATE:TUC-23798
T00ME01051 FINAL 10/10/2000 01/21/2001 MECH PRESSURE VESSEL INSPECTION: TUC-23022
T10OT01021 C OF O 05/11/2010 11/20/2010 C-OF-O C OF O: LAUNDROMAT
T10OT01894 DENIED 09/01/2010 N/A PEDDLER HOT DOG CART
T15EX03444 FINAL 12/08/2015 02/14/2016 EXCAV Tricon Contracting Inc. will be conducting an 8" main extension with asphalt and concrete crossing E Speedway Blvd. Nightime closure is requested beginning January 4 for approximately 5 days and the remainder of the time regular day. It will be approximately 10 days construction.
T15TC02699 EXPIRED 12/08/2015 N/A BARRICAD Tricon Contracting Inc. will be conducting an 8" main extension with asphalt and concrete crossing E Speedway Blvd. Nightime closure is requested beginning January 4 for approximately 5 days and the remainder of the time regular day. It will be approximately 10 days construction.
T18RW03726 FINAL 08/17/2018 09/19/2018 ROW Installation of new secondary electric conduits from existing pull box at SE corner of Pieology pizza restaurant through the parking lot to the existing electrical panels on the West side of Wildcat Laundry. The majority of this work is on private property in the shared business parking lot. The ROW portion of work will will include approximately 35' of trenching along Tyndall ROW (back of curb) with the installation of 2 - 3" conduits. All trenching in ROW is in dirt shoulder back of curb. No pavement cuts required, no sidewalk removal required. Potholing during day shift, and excavation and conduit installation during night shift.
T19BU00509 FINAL 10/08/2019 07/05/2020 DEMO DEMO
T19RW05503 FINAL 09/21/2019 10/24/2019 ROW 2 5X5 bellholes on concrete/blktop off of Tyndall Ave and 2 5x5 bellholes in alley--to permanently abandon and temporary abandon gas line crews will also be closing private parking lot to park crew trucks, business owner is aware WORK LOCATION: 902-914 E Speedway Blvd
T98ME00096 FINAL 02/03/1998 08/01/1998 MECH PRESSURE VESSEL CERTIFICATE
TUC-21586 CERTIFIC 06/19/1997 02/02/2000 VESSEL
TUC-23798 RENEWAL 06/26/1997 06/08/2003 VESSEL

Plans

Address: 902 E SPEEDWAY BL
Date - 11/15/2024 1:49 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T19PRE0006 CLOSED 01/22/2019 N/A NEIGHBORHOOD NOTIFICATION -- LABELS SITE/MGD - HUB IV