Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel136054240
JurisdictionTucson
City of Tucson ZoningR-1
Tucson WardWard 2
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 8834 E 27TH ST
Date - 01/31/2025 7:40 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-65-14 Pantano Area 2724 2768

Rezoning Cases

Date - 01/31/2025 7:40 a.m.
Total Number Of Rezone Cases - (2)
Case No. Description New Zone Status Status Date
C9-72-53 Tekton - Camino Seco R-1 Expired 09/07/2011
C9-75-20 Witt - Camino Seco R-1 Effectuated 07/19/2011

Permits

Address: 8834 E 27TH ST
Date - 01/31/2025 7:40 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
T03BU02969 FINAL 11/17/2003 08/25/2004 POOL/SPA POOL:GUNITE TD#15-40-40
T10CM01488 FINAL 06/01/2010 12/21/2010 COMBO INSTALL:ROOF MOUNTED PV SYS 5.06KW
T12CM01609 FINAL 04/04/2012 11/04/2012 COMBO SOLAR PV ROOF MOUNT - RES
T21RW00910 FINAL 02/25/2021 04/01/2021 ROW 4X6 PIT TO BE DIG ON ASPHALT TO EXPOSE CABLE SPLICE INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.