Address: 8815 S ALVERNON WY
Date - 02/07/2025 8:08 a.m.
Total Number Of Permits - (5)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-1224-02330 Complete 12/10/2024 02/06/2025 Right-of-Way (ROW) - Utility P.272645-2 : PLACE 4180'OF AERIAL CABLE (CIVIL SHEETS 10-17) , TRENCH 10', DIG 4 PITS, PLACE 3 NEW HHs, & BORE 249'
TR-UTL-1224-02300 Withdrawn 12/05/2024 N/A Right-of-Way (ROW) - Utility P.272645-2 : BORE 249', DIG 6 PITS , TRENCH 15', PLACE 5 MH/HH, & PLACE 6607' FT OF AERIAL CABLE & PLACE 4 DOWN GUYS/ANCHORS & ACCESS MH 25031
TE-FPU-1023-00373 Issued 10/31/2023 12/31/2024 Floodplain Use Installation of 6800' of new 24" and 2600' of 16" water main in city of tucson ROW
TR-ROW-0324-00274 Void 03/10/2024 N/A Right-of-Way (ROW) Pot hole existing conduit for TEP inspection
TR-UTL-0124-00003 Complete 01/02/2024 04/14/2024 Right-of-Way (ROW) - Utility WO T40649. TEP to work in road ROW on East side of Alvernon Way to replace utility pole. Pole replacement will not affect traffic on Alvernon Way. (Pole Located in at Edge of City of Tucson ROW, Utility Access Road located in Pima County )

Record Requests

Address: 8815 S ALVERNON WY
Date - 02/07/2025 8:08 a.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-1224-08375 Withdrawn 12/09/2024 N/A Requests P.272645-2 : BORE 249', DIG 6 PITS , TRENCH 15', PLACE 5 MH/HH, & PLACE 6607' FT OF AERIAL CABLE & PLACE 4 DOWN GUYS/ANCHORS & ACCESS MH 25031
REQ-1224-08576 Submitted - Online 12/17/2024 N/A Requests Installation of 6800' of new 24" and 2600' of 16" water main in city of Tucson ROW. City of Tucson has requested us to keep this permit till December 2025.