| Parcel | 114511990 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | O-3, C-1 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Bear Canyon |
| Major Street & Route | Scenic Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 8701 E TANQUE VERDE RD
Date - 12/08/2025 6:03 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/08/2025 6:03 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-21-14 | The Place at Mason Ranch Ph II | R-3 | Authorized | 08/17/2021 |
Permits
Address: 8701 E TANQUE VERDE RD
Date - 12/08/2025 6:03 p.m.
Total Number Of Permits - (12)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-FPU-1124-00400 | Issued | 11/18/2024 | 04/08/2025 | Floodplain Use | Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. | |
| TR-PIA-1124-00020 | Submitted - Online | 11/18/2024 | N/A | Private Improvement Agreement (PIA) | Primary scope of work includes installing 3740 of new 8in sewer line along the south side of E. Tanque Verde Rd. with a full road crossing from north to south at each the maximum west end of the project and maximum east end of the project. PIA work includes the removal and eventual replanting of trees within COT ROW, and the replacing of median curb and landscape due to excavation crossing E. Tanque Verde Rd. from north to south in two locations. | |
| TR-UTL-1124-02182 | Complete | 11/18/2024 | 04/08/2025 | Right-of-Way (ROW) - Utility | Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK. | |
| TE-FPU-1025-00396 | Issued | 10/29/2025 | 02/09/2026 | Floodplain Use | Public sewer improvement project. Installing 3,600lf of new sewer main in the west bound right travel lane on E. Tanque Verde Rd. west of N. Bear Canyon Rd. | |
| TR-ROW-1025-01347 | Inspections | 10/29/2025 | 02/09/2026 | Right-of-Way (ROW) | Public sewer improvement project. Installing 3,600lf of new sewer main in the west bound right travel lane on E. Tanque Verde Rd. west of N. Bear Canyon Rd. | |
| TE-FPU-1025-00391 | Void | 10/22/2025 | N/A | Floodplain Use | FUP permit Void as Primary Permit Request TR-UTL-1025-01840 (8701 E TANQUE VERDE RD TUCSON, AZ 85749) was void by DTM Permit Review --- Public sewer improvement project. Installing 3,600lf of new sewer main in the west bound right travel lane on E. Tanque Verde Rd. west of N. Bear Canyon Rd. | |
| TR-UTL-1025-01840 | Void | 10/22/2025 | N/A | Right-of-Way (ROW) - Utility | Public sewer improvement project. Installing 3,600lf of new sewer main in the west bound right travel lane on E. Tanque Verde Rd. west of N. Bear Canyon Rd. | |
| D98-0036 | Approved | 06/24/1998 | N/A | Development Package | TANQUE VERDE CASITAS | |
| TS-PRM-0623-00364 | Issued | 06/21/2023 | 08/14/2024 | Sign - Permanent | DF ENTRY SIGN (REVISED ON 10/13/23 TO REMOVE ELECTRICAL ASPECT, CO-LOCATE A PANEL NOW ON EXISTING SITE WALL INSTEAD OF FREESTANDING SIGN STRUCTURE) | |
| TE-FPU-0425-00175 | Issued | 04/29/2025 | 08/11/2025 | Floodplain Use | PLEASE REFERENCE PERMIT TR-UTL-1124-02182 and TE-FPU-1124-00400. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. | |
| TR-UTL-0425-00709 | Complete | 04/29/2025 | 08/11/2025 | Right-of-Way (ROW) - Utility | PLEASE REFERENCE PERMIT TR-UTL-1124-02182. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 6am to 2pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed | |
| TC-COM-0123-00426 | Expired | 01/05/2023 | 07/04/2024 | Commercial Building | Resurface swimming pool, new waterline tile, new pentair 420 Cart filter, new pentair whisperflo 2.6 VST, new vacless (SVRS), LED pool light (white), 320 Rainbow Chlorinator, new flometer, new pressure gauges Exisiting equipment: Pentair Cartridge Filter Model 320, Pentair pump Intelliflo VS + SVRS |
Code Enforcement
Address: 8701 E TANQUE VERDE RD
Date - 12/08/2025 6:03 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0124-00294 | Closed - Unfounded | 01/19/2024 | 01/30/2024 | RMIN : UNIT #21 - Electric wires are not up to code, exposed wires throughout the whole house /cut adaptor |
Plans
Address: 8701 E TANQUE VERDE RD
Date - 12/08/2025 6:03 p.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T05BA00122 | Approved | 06/27/2005 | N/A | -- Stormwater Basin |
Record Requests
Address: 8701 E TANQUE VERDE RD
Date - 12/08/2025 6:03 p.m.
Total Number Of Requests - (4)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0125-00439 | Withdrawn | 01/17/2025 | N/A | Requests | Primary scope of work includes installing 3740 of new 8in sewer line along the south side of E. Tanque Verde Rd. with a full road crossing from north to south at each the maximum west end of the project and maximum east end of the project. PIA work includes the removal and eventual replanting of trees within COT ROW, and the replacing of median curb and landscape due to excavation crossing E. Tanque Verde Rd. from north to south in two locations. PER TDC Reviewer, permit has already been obtained through the GC for this project. Please withdraw permit. |
| REQ-0525-03132 | Complete | 05/05/2025 | 05/05/2025 | Requests | DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK. Work under permit did not begin before the permit had expired. Per new permit application review comments, this permit to be renewed as opposed to issuing a new permit. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed |
| REQ-0525-03134 | Denied | 05/05/2025 | N/A | Requests | Work under FP Permit and main ROW Permit did not begin before permits expired. Per new permit request review comments, permit to be requested to be renwed/extended as opposed to issuing a new permit. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. |
| REQ-1223-06587 | Approved | 12/04/2023 | 12/12/2023 | Requests | DF ENTRY SIGN (REVISED ON 10/13/23 TO REMOVE ELECTRICAL ASPECT, CO-LOCATE A PANEL NOW ON EXISTING SITE WALL INSTEAD OF FREESTANDING SIGN STRUCTURE) |