Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Permits

Address: 84 N 6TH AV
Date - 12/24/2024 5:28 p.m.
Total Number Of Permits - (3)
Permit Status Apply Date Expired Date Unit Type Description
T19RW01408 Complete 03/15/2019 05/28/2020 Right-of-Way Small Wireless REPLACE CITY OF TUCSON STREET LIGHT POLE WITH A NEW POLE TO MATCH EXISTING CITY LOOK AND DESIGN THAT; Work Order: TUC Green Arrow 2 SC
T19RW05348 FINAL 09/18/2019 11/23/2019 ROW Boring and excavation for new fiber optic cable installation owned by the Zayo Group. (TUC Green Arrow 2 SC) NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO YOU WILL HAVE TO NOTIFY SUN TRAN 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO TEMPORARY NOISE EXEMPTION (TNE) IS ATTACHED TO THIS PERMIT, TNE FROM OCTOBER 24, 2019 - NOVEMBER 23, 2019 FROM 6:00 PM- 6:00 AM 6th is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions.
T20RW00127 FINAL 01/09/2020 01/30/2020 ROW ASPHALT/CONCRETE RESTORATION FROM FIBER OPTIC CABLE INSTALLATION - TUC GREEN ARROW 2 SC (PREVIOUS NUMBER T19RW05348). USE ASPHALT MIX CITY OF TUCSON MIX #2. SAW CUTS SHALL BE DONE UP TO CURB/CONCRETE AND MUST BE CLEAN CONSISTENT CUTS THAT MEET PAVEMENT MORATORIUM STANDARDS. PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER SHALL BE RESTORED AS ONE CLUSTER PATCH. INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE AS A STAND ALONE. * CONGRESS STREET IS A MILL AND FILL ONLY. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 &/OR CHRISTINA ROCK AT 520-206-8934 MINIMUM OF 24 HOURS PRIOR TO START OF WORK. CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHALL BE REMOVED PRIOR TO 3:30 PM ** Permit end date has been modified due to traffic restriction beginning January 31, 2020 - February 16, 2020 (Gem Show).