Address Search: 823 N QUEEN AV
Search
Parcel Attributes
| Parcel | 117031660 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Dunbar Spring |
| National Register Historic District | John Spring Neighborhood Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 823 N QUEEN AV
Date - 10/17/2026 2:58 a.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL |
Permits
Address: 823 N QUEEN AV
Date - 10/17/2026 2:58 a.m.
Total Number Of Permits - (2)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22CM00721 | Expired | 01/31/2022 | N/A | Commercial Building | Upgrading 4 40 amp disconnects to 4 100 amp panels | |
| T21RW02984 | FINAL | 06/21/2021 | 07/25/2021 | ROW | (2) 5X5 bellholes in dirt/blktop front to repair/replace gas line. Crews will also be working at 825 N Queen Ave & 837 N Queen Ave. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS Proof of notification is required at the time of the preconstruction meeting. |