Address Search: 7900 E BROADWAY BL
Search
Annexations & Original City Zoning (OCZ)
Address: 7900 E BROADWAY BL
Date - 11/10/2024 2:55 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/10/2024 2:55 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-78-37 | Shell Oil Co. - Broadway | B-2A | Denied | 05/19/2011 |
Special Development Requests & Requirements
Address: 7900 E BROADWAY BL
Date - 11/10/2024 2:55 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T14SA00288 | COMPLETE | 09/12/2014 | N/A | Zoning Adminstration Letter |
Permits
Address: 7900 E BROADWAY BL
Date - 11/10/2024 2:55 p.m.
Total Number Of Permits - (35)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FCP-1122-00048 | Complete | 11/08/2022 | N/A | Fire Construction Permit | Circle K - In lieu of Operational permit | |
TF-FCP-1122-00051 | Complete | 11/08/2022 | N/A | Fire Construction Permit | Remove and replace 6 dispenser containment sumps | |
T22CM07963 | Issued | 10/17/2022 | 10/24/2023 | Commercial Building | Replace 6 dispenser containment sumps, existing dispensers to remain | |
T21FC00740 | Expired | 09/29/2021 | 10/05/2022 | Fire Construction Permit | Flammable & Combustible Liquid - DEGAS ONE UST, OPEN TOP OF TANK, CLEAN & INSPECT, COMPLETE REPAIRS AS REQUIRED & RELINE TANK WITH APPROVED AZDEQ PERMIT, NORTHWEST FIRE DISTRICT PERMIT#BPC-21-064 & AZDEQ INTERIOR LINING CERTIFICATION IL 00069.; Other Construction Permit | |
TC-COM-0824-01534 | Fees Due | 08/06/2024 | 02/02/2025 | Commercial Building | New interior merchandising program with no sf increase or structural modifications to the interior/exterior of the building. No site improvements or modifications to the fuel canopy, fuel installation or signage. NO FIRE ALARM OR SPRINKLERS ARE EXISTING OR REQUIRED. | |
TR-UTL-0723-02066 | Complete | 07/19/2023 | 10/09/2023 | Right-of-Way (ROW) - Utility | 2 5x5 bellholes in blktop for crews to repair gas line- Emergency Work | |
TC-COM-0524-00971 | Issued | 05/21/2024 | 12/08/2024 | Commercial Building | UPGRADE EXISTING ELECTRICAL SERVICE TO 800A, 3PH, 120/208V | |
TF-FCP-0423-00609 | Void | 04/19/2023 | N/A | Fire Construction Permit | VOID-CONTACT INSPECTOR JESUS SILVA (520)837-7094-PLEASE APPLY FOR A OTHER IFC CONSTRUCTION PERMIT AND OWNER NEEDS TO APPLY FOR A GENERAL OPERATIONAL PERMIT-MUST ATTACH PAPERWORK TO BOTH PERMITS-Replace 6 dispenser containment sumps, existing dispensers to remain | |
T21CM02471 | Withdrawn | 03/18/2021 | 10/24/2024 | Commercial Building | Upgrade existing electrical to 800A, 3PH, 120/208V | |
T00EL00550 | FINAL | 03/06/2000 | 10/11/2000 | ELECT | SIGN:CIRCUIT | |
T00EL00582 | FINAL | 03/08/2000 | 10/11/2000 | ELECT | SIGN:CIRCUIT:629 | |
T00EL01051 | FINAL | 04/24/2000 | 10/25/2000 | ELECT | SIGN:ELECTRIC:TS200004-847 | |
T04EL00226 | FINAL | 02/05/2004 | 09/12/2004 | ELECT | REPLACE:FUEL DISPENSERS | |
T04OT01644 | FINAL | 08/17/2004 | 09/05/2005 | SIGN | SIGN:ELECTRIC:7620 | |
T06PL00230 | EXPIRED | 02/03/2006 | 08/08/2006 | PLUMB | REPAIR:BUILDING DRAIN | |
T10OT02621 | FINAL | 12/10/2010 | 06/11/2011 | SIGN | 19145 | |
T11CM00585 | EXPIRED | 02/24/2011 | 08/23/2011 | COMBO | REPLACE (2) 5 TON ROOFMOUNT HEAT PUMPS; "CIRCLE K" (APA) | |
T14EX01221 | CLOSED | 12/01/2014 | 01/30/2015 | EXCAV | WE WILL BE PUTTING NORTHBOUND TRAFFIC ON PANTANO RD INTO THE DOUBLE YELLOW FROM BROADWAY BLV TO BAKER TO TRENCH. THEN WE WILL FLIP CLOSURE FOR SOUTH BOUND PUSHING SOUTH BOUND INTO DOUBLE YELLOWS FROM SPEEDWAY TO BAKER. THAT CLOSURE WILL COME DOWN THEN WE WILL BE SETTING A EASTBOUND RIGHT LANEON SPEEDWAY AT PANTANO TO BORE ACROSS PANTANO FOR CROSSING AND TRUCK SHADOW ACROSS SPEEDWAY FOR POT HOLING AND THE SAME ON BROADWAY BLV. | |
T14TC02960 | CLOSED | 11/26/2014 | N/A | BARRICAD | Street Maintenance Daily 11-21-14 | |
T14TC02994 | FINAL | 12/01/2014 | 02/02/2015 | BARRICAD | WE WILL BE PUTTING NORTHBOUND TRAFFIC ON PANTANO RD INTO THE DOUBLE YELLOW FROM BROADWAY BLV TO BAKER TO TRENCH. THEN WE WILL FLIP CLOSURE FOR SOUTH BOUND PUSHING SOUTH BOUND INTO DOUBLE YELLOWS FROM SPEEDWAY TO BAKER. THAT CLOSURE WILL COME DOWN THEN WE WILL BE SETTING A EASTBOUND RIGHT LANEON SPEEDWAY AT PANTANO TO BORE ACROSS PANTANO FOR CROSSING AND TRUCK SHADOW ACROSS SPEEDWAY FOR POT HOLING AND THE SAME ON BROADWAY BLV. | |
T15TC01344 | FINAL | 05/30/2015 | N/A | BARRICAD | MILL & OVERLAY; CRACKSEALING, UTILITY ADJUSTMENTS | |
T16RW00207 | EXPIRED | 06/24/2016 | 08/26/2016 | ROW | HEADING NORTH ON PANTANO JUST SOUTH OF BROADWAY, TRENCH/BORE 195' IN DIRT TO THE NORTHEAST CORNER OF PANTANO AND OUT OF ROW *****NOTE CHANGES MADE BY APPLICANT ON 7/26/15: Starting on the E side of N Pantano just N. of 5Th St. pull through Existing Conduit 1021' then riser up pole and Over lash to Existing 1 1/4" strand heading S for 1922' Then Riser down pole on the S/E corner of E Broadway Blvd | |
T17CM01672 | EXPIRED | 03/01/2017 | 09/09/2017 | COMBO | REPLACE OUTDOOR LIGHTING FIXTURES WITH LED | |
T17CM02736 | EXPIRED | 04/10/2017 | 11/06/2017 | COMBO | REMOVE & REPL 6 FUEL DISPENSERS | |
T17CM03434 | FINAL | 05/02/2017 | 10/30/2017 | COMBO | REPL SEWER LINE FROM CLEANOUT TO CLAY | |
T17FO00158 | FINAL | 02/23/2017 | 11/12/2017 | FIREOPER | FLAMMABLE LIQUIDS USED IN FUEL DISPENSING | |
T17OT01156 | FINAL | 11/06/2017 | 09/05/2018 | SIGN | 6 -ILLUMINATED SIGNS (2 DF, 4 WALL) | |
T20FC00026 | FINAL | 01/15/2020 | 02/02/2021 | FIRECONS | Replace Siphon line between UNL tanks | |
T20RW00262 | FINAL | 01/15/2020 | 02/21/2020 | ROW | TEP will install a 36"x48" temporary project notification sign on two 8' steel posts, holes for the posts will be 1' wide and 2' deep. | |
T20RW03422 | FINAL | 06/17/2020 | 07/17/2020 | ROW | TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the posts are: 32°13'13.84"N 110°49'25.16"W. Please see attached map for offsets from street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you. | |
T21RW02207 | FINAL | 05/06/2021 | 01/01/2022 | ROW | rom the TEP West of 7901 E Golf Links Rd, begin 290' removal of aerial overhash. Part 2: Riser down TEP pole and begin 290' metro bore, placing 4-2'' conduit and 288ct fiber to COX ped, tie in Proof of notification is required at the time of the preconstruction meeting. | |
T22CM04521 | FINAL | 06/16/2022 | 01/22/2023 | COMBO | Replace 400 amp main disconnect - Like for Like | |
T97CM02715 | FINAL | 08/29/1997 | 11/24/1998 | COMBO | REMODEL:STORE:CONVENIENCE | |
T99ME00671 | EXPIRED | 06/24/1999 | 12/21/1999 | MECH | AIR COND:REPLACEMENT (2) | |
T99ME00893 | EXPIRED | 08/16/1999 | 02/12/2000 | MECH | (2)CONDENSING UNITS:REPLACEMENT |
Record Requests
Address: 7900 E BROADWAY BL
Date - 11/10/2024 2:55 p.m.
Total Number Of Requests - (12)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0123-00696 | Complete | 01/11/2023 | 01/25/2023 | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0323-01795 | Complete | 03/24/2023 | 08/01/2023 | Requests | Circle K - In lieu of Operational permit Charles E. Thomas Company was recently added as the Contractor and work is being scheduled to commence in the following week or two |
REQ-0324-02405 | Complete | 03/26/2024 | 05/10/2024 | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0423-01952 | Complete | 04/04/2023 | 04/12/2023 | Requests | Replace 6 dispenser containment sumps, existing dispensers to remain |
REQ-0423-01954 | Complete | 04/04/2023 | 04/12/2023 | Requests | Replace 6 dispenser containment sumps, existing dispensers to remain |
REQ-0424-02784 | Canceled | 04/10/2024 | N/A | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0424-02818 | Canceled | 04/12/2024 | N/A | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0424-02900 | Canceled | 04/16/2024 | N/A | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0424-03062 | Complete | 04/23/2024 | 05/17/2024 | Requests | revert back to previous underground plan |
REQ-0524-03280 | Canceled | 05/01/2024 | N/A | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0524-03562 | Canceled | 05/10/2024 | N/A | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |
REQ-0623-03333 | Complete | 06/15/2023 | 10/23/2023 | Requests | Upgrade existing electrical to 800A, 3PH, 120/208V |