Address Search: 721 S IRVING AV
Search
Parcel Attributes
| Parcel | 126170270 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | San Gabriel |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 721 S IRVING AV
Date - 11/17/2026 1:03 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 721 S IRVING AV
Date - 11/17/2026 1:03 a.m.
Total Number Of Permits - (5)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T15CM01216 | FINAL | 02/23/2015 | 09/07/2015 | COMBO | SERVICE UPGRADE UP TO 200 AMPS | |
| T18CM07548 | FINAL | 09/21/2018 | 04/07/2019 | COMBO | INSTALL PHOTOVOLTAIC EQUIPMENT AND RELATED MATERIALS | |
| T20RW05060 | WITHDRWN | 09/15/2020 | N/A | ROW | HORIZONAL CURB CUTS FOR SEMI-CIRCULAR DRIVEWAY WITH 10' BASE AND 3' WINGS. CURB CUT FOR WATER HARVESTING ON THE SOUTHERN END OF THE PROPERTY. | |
| T21RW03281 | FINAL | 07/09/2021 | 08/12/2021 | ROW | (2) 5X5 BELLHOLES IN THE DIRT AREA ONT HE SOUTH SIDE OF SANTA BARBARA AVE TO ABANDON GAS SERVICE PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| T22RW02932 | FINAL | 08/15/2022 | 10/02/2022 | ROW | Horizontal curb saw cut 10' base with two 3' wings on each end. Standard concrete curb. 3' curb cut for water harvesting on the southern end of the property. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Provide a 5' clear pedestrian access across property and a 2' pedestrian refuge per David Marhefka's conditions. NO LANES OF TRAFFIC ON IRVING AV WILL BE AFFECTED. |