Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel116230210
JurisdictionTucson, Pima County
Water Course

Culvert

City of Tucson ZoningI-1
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodBarrio Viejo
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 708 W 18TH ST
Date - 11/18/2026 11:38 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202

Special Development Requests & Requirements

Address: 708 W 18TH ST
Date - 11/18/2026 11:38 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
T05SA00268 VOID 07/13/2005 N/A Board of Adjustment

Permits

Address: 708 W 18TH ST
Date - 11/18/2026 11:38 p.m.
Total Number Of Permits - (11)
Permit Status Apply Date Expired Date Unit Type Description
DS05-29 Approved 11/23/2005 N/A Zoning Verification Letter THE PALLET GUY - DSMR 05-29 THE PALLET GUY
T00EL02246 FINAL 09/19/2000 05/18/2002 ELECT REPLACE:ELECTRIC:WIRING
T05CM03601 FINAL 07/11/2005 05/13/2007 COMBO SITE IMPROVEMENTS T03ZV00219
T05OT01697 FINAL 07/11/2005 N/A FLOODPLN FLOODPLAIN USE PERMIT
T06MS00030 ISSUED 02/06/2006 N/A MISC
T06PL02113 FINAL 11/15/2006 05/28/2007 PLUMB RECONNECT:GAS LINE:SFR
T17RW01140 FINAL 03/13/2017 01/10/2018 ROW ISSAP (PH. II/III) ATLAS 0038 (32 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. NOTE: AS GRANDE BL IS UNDER A PAVEMENT MORATORIUM, ANY CUTS IN THE ASPHALT WILL REQUIRE A 2" MILL AND REPLACEMENT 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE TRENCH FOR ALL AFFECTED LANES
T19RW02769 FINAL 05/16/2019 07/07/2019 ROW RE-EXCAVATE VALVE ORIGNALLY EXCAVATED AND PLATED BY TUCSON WATER TO INSTALL UNDERGROUND VALVE VAULT THEN REPAVE. WORK WILL BE COMPLETED IN 3 CONSECUTIVE DAYS
T98EL00723 FINAL 04/22/1998 11/15/1998 ELECT RECONNECT:ELECTRIC:AUTO REPAIR & OFFICE
T99CM03788 WITHDRWN 08/05/1999 N/A COMBO REPAIR:GENERAL
T99EL02225 EXPIRED 08/31/1999 04/03/2000 ELECT UPGRADE:ELECTRICAL 60 TO 200 AMP