Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel133181640
JurisdictionTucson, Pima County
Water Course

Street+culvert

City of Tucson ZoningR-1
Tucson WardWard 2
Tucson Registered NeighborhoodEl Gheko
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 7062 E 4TH ST
Date - 08/18/2026 9:52 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Permits

Address: 7062 E 4TH ST
Date - 08/18/2026 9:52 p.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
T22RW02883 Complete 08/11/2022 12/11/2022 Right-of-Way (ROW) SITES 2 THRU 4 - INSTALL APPROXIMATELY 1203 LF OF 8 CURED IN PLACE PIPE. THE CURED IN PLACE PIPE IS; Work Order: 322004
TR-UTL-0324-00527 Complete 03/18/2024 10/14/2024 Right-of-Way (ROW) - Utility WO 6366155. REPLACE 14 POLES, INSTALL 1 NEW POLE, REPLACE 15 SPANS OF OVERHEAD PRIMARY, INSTALL NEW SECONDARY PEDESTAL. TEP Contact: Sylvia Hyser @ (520) 305-0986.
TR-UTL-0326-00485 Complete 03/09/2026 06/21/2026 Right-of-Way (ROW) - Utility WO T176560. TEP will remove 1 pole in ROW with no sidewalk impact. 05/19/26- Renew permit for 30 days as of 05/22/26. new expiration date is 06/21/26.
T15EX00869 EXPIRED 05/09/2015 07/11/2015 EXCAV TRENCH 29' IN DIRT ON THE WEST SIDE OF KOLB RD, SOUTH OF 4TH ST, PLACE 1 ANCHOR ON POLE IN ALLEY. WORK ORDER # E.740554
T15TC01118 FINAL 05/09/2015 N/A BARRICAD TRENCH 29' IN DIRT ON THE WEST SIDE OF KOLB RD, SOUTH OF 4TH ST, PLACE 1 ANCHOR ON POLE IN ALLEY. WORK ORDER # E.740554
T19RW07422 FINAL 12/06/2019 01/10/2020 ROW (2) 5 X 5 BELLHOLES IN DIRT ALLEY TO RELOCATE GAS METER COYL PROJECT
T20CM08727 FINAL 12/14/2020 02/22/2022 COMBO Electrical upgrade up to 200 amp & relocation