Address Search: 702 E 17TH ST
Search
Parcel Attributes
| Parcel | 124150130 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Millville |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 702 E 17TH ST
Date - 08/18/2026 9:14 a.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 1/4 Mile Each Direction (N, E, S, W) | 202 |
Permits
Address: 702 E 17TH ST
Date - 08/18/2026 9:14 a.m.
Total Number Of Permits - (11)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1222-00263 | Void | 12/08/2022 | N/A | Commercial Building | *Void - RO. Incorrect work class permit type. Please apply under the correct work class permit type - Commercial Solar Permit. New Commercial Roof Mount Solar System | |
| TC-COM-0925-01647 | Complete | 09/09/2025 | 11/16/2026 | Commercial Building | INSTALLATION OF (7) NEW LVL 2 EV CHARGERS ON A NEW 400A MBP. LOAD CONTROLED BY PCS SOFTWARE | |
| TR-ROW-0224-00132 | Complete | 02/06/2024 | 04/20/2024 | Right-of-Way (ROW) | **Flagging/ Barricade only for RR crossing locations at 16th st & Toole, 17th st, 18th st, 19th st, 20th st, 22nd st and Silverlake Rd. Distance of permit request 5000 but LF of ROW impact does not reflect that ** Flagging operations only within the City right of way for off grade railroad work within the tracks only. | |
| TR-UTL-0224-00246 | Void | 02/06/2024 | N/A | Right-of-Way (ROW) - Utility | Flagging operations for Railroad repairs off grade. Advance Warning signage and flagging operations only in the City right of way. No full closures. | |
| TR-UTL-0126-00135 | Needs Resubmittal | 01/21/2026 | N/A | Right-of-Way (ROW) - Utility | Zayo contractor to pull fiber thru existing underground conduit. Zayo contractor to access existing HH's to facilitate pull thru of fiber. | |
| TR-UTL-0126-00047 | Needs Resubmittal | 01/07/2026 | N/A | Right-of-Way (ROW) - Utility | Zayo contractor to pull fiber thru existing underground conduit. Zayo contractor to accesss existing HH's to facilitate pull thru of fiber. | |
| TC-COM-0123-00409 | Complete | 01/04/2023 | 03/27/2024 | Commercial Building | New Commercial Roof Mount Solar System | |
| T07OT02748 | FINAL | 12/06/2007 | 07/26/2008 | SIGN | 14132 | |
| T17CM04020 | FINAL | 05/22/2017 | 01/15/2018 | COMBO | MODIFY AWNING | |
| T17OT00557 | FINAL | 05/30/2017 | 02/26/2018 | SIGN | 1-NON ILLUM AWNING SIGN | |
| T18CM05626 | C OF O | 07/19/2018 | 06/08/2019 | COMBO | TI:OFFICE |