Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6317 E BROADWAY BL
Search
Annexations & Original City Zoning (OCZ)
Address: 6317 E BROADWAY BL
Date - 11/23/2024 2:18 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 6317 E BROADWAY BL
Date - 11/23/2024 2:18 p.m.
Total Number Of Permits - (13)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T15BU01061 | FINAL | 09/11/2015 | 05/18/2016 | SPKLR | SPRINKLER | |
T15BU01109 | FINAL | 09/23/2015 | 05/23/2016 | SPKLR | FIRE SPRKL | |
T15BU01155 | FINAL | 10/05/2015 | 11/07/2016 | BUILD | ALARM | |
T15BU01433 | FINAL | 12/10/2015 | 09/07/2016 | BUILD | FIRE ALARM | |
T15BU01460 | FINAL | 12/18/2015 | 09/07/2016 | SPKLR | SPRINKLER | |
T15CM04804 | L OF C | 07/14/2015 | 09/06/2016 | COMBO | FOUNDATION ONLY-NEW SHELL | |
T15CM05483 | L OF C | 08/10/2015 | 10/05/2016 | COMBO | NEW SHELL- RETAIL BLDG | |
T15CM06580 | C OF O | 09/22/2015 | 09/10/2016 | COMBO | RETAIL | |
T15OT01670 | FINAL | 12/17/2015 | 10/23/2016 | SIGN | 1- ILLUM WALL SIGN / 2- TENANT PANEL'S ON PERMITED DF'S FOR STRIP DEVELOPMENT ON WILMOT & BROADWAY | |
T16CM00922 | FINAL | 02/08/2016 | 08/28/2016 | COMBO | RACKING - RETAIL | |
T16CM01223 | FINAL | 02/19/2016 | 08/28/2016 | COMBO | PALLET RACKING SHELVING | |
T16OT00663 | FINAL | 05/31/2016 | 06/06/2017 | SIGN | 1- ILLUM WALL SIGN | |
T22RW01886 | FINAL | 05/18/2022 | 09/08/2022 | ROW | Starting at the northside of 6307 E Broadway Blvd trench thru dirt 6' north, 16' east 10' south and begin overlash of 48ct heading west apprx 271' and continue on to private property. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 |