Parcel Attributes
Parcel11820048A
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-1
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodBarrio Santa Rita Park-West Ochoa
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 545 W 22ND ST
Date - 12/07/2025 4:50 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202

Permits

Address: 545 W 22ND ST
Date - 12/07/2025 4:50 a.m.
Total Number Of Permits - (9)
Permit Status Apply Date Expired Date Unit Type Description
T00ME00744 FINAL 06/27/2000 12/24/2000 MECH PRESSURE VESSEL CERTIFICATE:TUC-23993
T06PL01466 FINAL 08/14/2006 02/12/2007 PLUMB SEWER LINE REPAIR
T12OT00098 EXPIRED 01/18/2012 10/16/2012 SIGN BANNER:90 DAYS 1-18-2012 TO 04-15-2012
T15EX01808 EXPIRED 06/18/2015 08/28/2015 EXCAV 12" X 12" AIR VACUUM EXCAVATION OF 9 POTHOLES ALONG FORMER UPRR ROW FOR PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPT. SOUTHEAST INTERCEPTOR AUGMENTATION FEASIBILITY STUDY ALIGNMENT SEWER DESIGN PROJECT ***NIGHT TIME WORK ONLY 7PM-6AM NO WORK ON 22ND FROM 7/3/15 THRU 7/5/15***
T15TC01515 FINAL 06/18/2015 N/A BARRICAD 12" X 12" AIR VACUUM EXCAVATION OF 9 POTHOLES ALONG FORMER UPRR ROW FOR PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPT. SOUTHEAST INTERCEPTOR AUGMENTATION FEASIBILITY STUDY ALIGNMENT SEWER DESIGN PROJECT
T16RW00904 FINAL 08/03/2016 12/29/2016 ROW Installing a 110 LF of 60" casing underneath 22nd St to carrier 42" sanitary sewer line. Bore pit is 20' wide by 40' long and receiving pit will be 10' by 10'. Pedestrian barrier will be placed on both sides along with security fence to keep peds. protected from excavations. 11/14/2016-R1 JACK AND BORE HAS BEEN COMPLETED UNDERNEATH 22ND ST; TRAFFIC CONTROL BARRICADES ALONG RIGHT OF WAY ARE STILL IN PLACE UNTIL FINAL GRADING IS COMPLETE HOURS: 6:30AM-2:30PM
T16RW02450 FINAL 11/02/2016 12/03/2016 ROW Installation of 1200lf of new 42" sanitary sewer along Osborne Ave. between 22nd St. and 25th St. Excavation is close to the edge of roadway with a depth of 25 ft. KE&G would like to keep Osborne closed during the duration of the sewer installation. All per DP G-2016-014 (3SEI13).
T19RW07149 FINAL 11/21/2019 06/30/2020 ROW JOC FOR ROADWAY CONSTRUCTION, CONTRACT NO 171729-03 WORK INCLUDES CONSTRUCTING A NEW GREENWAY AND DG PATH ALONG OSBORNE FROM 22ND ST TO 25TH ST, ADDING A NEW PEDESTRIAN AND BIKE CROSSING ACROSS 2ND AT OSBORNE, AS WELL AS ELECTRICAL LIGHTING AND ALL NEW LANDSCAPING
TUC-23993 RENEWAL 07/11/1997 04/25/2003 VESSEL