Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel137040070
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 5363 S MISSIONDALE RD
Date - 12/24/2024 1:11 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Permits

Address: 5363 S MISSIONDALE RD
Date - 12/24/2024 1:11 a.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TC-RES-1023-08860 Complete 10/17/2023 01/15/2025 Residential Building - One or Two Family Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.

Record Requests

Address: 5363 S MISSIONDALE RD
Date - 12/24/2024 1:11 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0424-03086 Complete 04/23/2024 06/12/2024 Requests 90 DAYS EXTENTION REQUIRED AS PAVING WORK DID NOT ALLOW US TO BE ON JOB SITE Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.