Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 5321 S MISSIONDALE RD
Search
Annexations & Original City Zoning (OCZ)
Address: 5321 S MISSIONDALE RD
Date - 11/27/2024 1:26 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 5321 S MISSIONDALE RD
Date - 11/27/2024 1:26 a.m.
Total Number Of Permits - (3)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-1222-00169 | Complete | 12/19/2022 | 02/04/2023 | Right-of-Way (ROW) | Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2 | |
TC-RES-1023-08722 | Complete | 10/12/2023 | 02/12/2025 | Residential Building - One or Two Family | Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side. | |
T15EX01707 | FINAL | 06/10/2015 | 04/24/2015 | EXCAV | (1) 5’X5’ BELLHOLE TO REPLACE SERVICE (PAVEMENT) REPLACE PERMT#U2015000918 |
Record Requests
Address: 5321 S MISSIONDALE RD
Date - 11/27/2024 1:26 a.m.
Total Number Of Requests - (1)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0424-03024 | Complete | 04/22/2024 | 11/07/2024 | Requests | 90 DAYS EXTENTION REQUIRED AS PAVING WORK DID NOT ALLOW US TO BE ON JOB SITE Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side. |