Address Search: 5285 E KNIGHT DR
Search
Parcel Attributes
| Parcel | 121136410 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | OCR-2, C-1 |
| Tucson Ward | Ward 6 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Historic Records Requests
Address: 5285 E KNIGHT DR
Date - 08/19/2026 4:36 a.m.
Total Number Of Historic Records Requests - (3)
| Name | Action |
|---|---|
| Address: 5285 E KNIGHT DR - Doc Type: CERT OF OCC | |
| Address: 5285 E KNIGHT DR - Doc Type: CERT OF OCC | |
| Address: 5285 E KNIGHT DR - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 5285 E KNIGHT DR
Date - 08/19/2026 4:36 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 5285 E KNIGHT DR
Date - 08/19/2026 4:36 a.m.
Total Number Of Permits - (5)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T10OT00635 | C OF O | 03/23/2010 | 09/22/2010 | C-OF-O | C OF O:PREMIER HEARING CENTER | |
| T21RW02016 | FINAL | 04/26/2021 | 07/03/2021 | ROW | Starting on the West side of N Beverly and South of E Grant Rd, Riser up TEP pole going South, Replace coax cable from existing Ped to pole Like for like. 1) Traffic control setup shall not commence prior to 9:00am and removed prior to 3:30pm. 2) All trenches over night shall be plated. | |
| T21RW04355 | FINAL | 09/22/2021 | 11/07/2021 | ROW | (2) 5X5 bellholes in dirt/concrete front (east side of property) to repair/replace gas line. Crews will also be working at 5295 E Knight Dr, working by N Beverly Ave. *Crews may be working Saturdays from 6:00 am to 3:00 pm. Proof of notification is required at the time of the preconstruction meeting. | |
| T21RW04642 | FINAL | 10/12/2021 | 12/05/2021 | ROW | From the existing Cox vault East of 5285 E Knight Dr, remove and replace 59' fiber cable out of case heading South and continue 65' heading West to existing vault and continue 12' to TEP pole, riser up. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 11/22/2021 - PLAN ADD - R1 ADDING NEW TNE FOR UPCOMING WORK ON 12/03/2021 - R1 | |
| T21RW04894 | FINAL | 11/03/2021 | 01/12/2022 | ROW | 10' TRENCHING FROM NEW POLE TO PED. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |