Address Search: 5280 E GRANT RD
Search
Parcel Attributes
| Parcel | 121136130 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 6 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 5280 E GRANT RD
Date - 08/19/2026 6:22 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 5280 E GRANT RD
Date - 08/19/2026 6:22 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000008080 | CLOSED | 09/21/2016 | N/A | Historical Information |
Permits
Address: 5280 E GRANT RD
Date - 08/19/2026 6:22 p.m.
Total Number Of Permits - (11)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T20OT00704 | Submitted | 10/14/2020 | N/A | Sign - Permanent | 1- CofC monu | |
| TR-UTL-0523-01449 | Complete | 05/04/2023 | 07/17/2023 | Right-of-Way (ROW) - Utility | WO T69973 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled with/out sidewalk impact. | |
| TR-UTL-0323-01179 | Complete | 03/28/2023 | 07/17/2023 | Right-of-Way (ROW) - Utility | PRJ246242-1 COX TO PULL 4' FOR CATV CONDUIT FOR SYSTEM TIE | |
| T01OT00288 | EXPIRED | 08/08/2001 | 02/04/2002 | SIGN | SIGN:2878 | |
| T01OT00309 | FINAL | 08/10/2001 | 03/19/2002 | SIGN | SIGN:2878 | |
| T03OT00976 | FINAL | 05/30/2003 | 01/04/2004 | SIGN | SIGN:# 5597 | |
| T15TC02533 | FINAL | 11/06/2015 | N/A | BARRICAD | STURGEON ELECTRIC WORKING ON POLES ON EASTBOUND GRANT RD/W OF BEVERLY AV | |
| T17RW02268 | FINAL | 05/25/2017 | 09/17/2017 | ROW | ACCESS EXISTING MANHOLE 20480 | |
| T18OT01010 | FINAL | 09/24/2018 | 08/04/2019 | SIGN | 2- ILLUM WALL SIGNS | |
| T18RW00931 | FINAL | 02/23/2018 | 04/30/2018 | ROW | Start Point: On the South side of E Grant Rd and W of Grant Rd, begin 425' overlash heading West , riser down and begin 130' double stuff through existing, heading North. Place 3x3 pothole and replace vault with new ped vault. continue 138' heading East . Place 3x3 pothole intercept existing conduit. Continuing East, begin 450' underground bore/trench pull cable 1x2'' conduit , place 3x3 pothole head North 25' and place 3x3 pothole and new Cox ped, continue 105' bore/trench heading East , place 3x3 pothole and new COX ped, continue 25' North to Out of Row | |
| T22RW02693 | FINAL | 07/27/2022 | 08/15/2022 | ROW | WO# T43480 TEP HAD TO REPLACE HIT POLE AS AN EMERGENCY. TPD CASE #P2207170077. AERIAL WORK AND EXCAVATION. EMERGENCY AFTERTHE FACT Emergency - After the fact permit - a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to TEP to address since DTM did not have an opportunity to review, approve or inspect work. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |